Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

10 unique locations (398 components)

Chase Hill Road Killingholme North Lincolnshire DN40 3LU (35 components)
โ€ข A 7.5MW Tesla Battery Energy Storage System
โ€ข Killingholme Module 1 converted to open cycle operation
โ€ข Killingholme Module 2 converted to open cycle operation
Active โ€ข 2028-29 (T-4), 2026-27 (T-4) ...
2098.53 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (73 components)
โ€ข BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
โ€ข BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
โ€ข BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
1613.68 MW
EDF Energy, Hartlepool power station, Tees Road, Hartlepool, TS25 2BZ (57 components)
โ€ข Hartlepool Power Station CMU 2: [HR2-23] T_HRTL-2
โ€ข Hartlepool Power Station CMU 2: [HR2-24] T_HRTL-2
โ€ข Hartlepool Power Station CMU 1: [HR1-24] T_HRTL-1
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
5859.76 MW
Land At Junction With Hunsley Street and Carlisle Road, Sheffield, S4 8DQ (25 components)
โ€ข 1,000MW electricity interconnector between GB and Belgian transmission systems. The Nemo Link interconnector will consist of subsea and underground cables connected to a converter station in each country, which will allow electricity to flow in either direction between the two countries. Nemo Linkยฎ will build the converter station on an 8 hectare site, formerly occupied by the Richborough Power Station, which now forms part of the Richborough Energy Park proposals. A similar converter station will be built in the industry zone Herdersbrug in Bruges.
โ€ข Battery energy storage unit
โ€ข Two gas CHP in a horticultural environment with no aux load
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
21.52 MW
Nr 125 Park Lane Cottingham East Yorkshire HU16 5RX (23 components)
โ€ข CHP at a horticultural environment.
โ€ข CHP at horticultural site
โ€ข Gas CHP engines in commercial horticultural environment with no auxilliary load
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
17.83 MW
Plot 6 Barrow Man Road, Birchington CT7 0AX (19 components)
โ€ข CHP engine in a horticultural environment, natural gas, no aux load
โ€ข New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
โ€ข The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
Active โ€ข 2028-29 (T-4), 2024-25 (T-4) ...
14.72 MW
Power Station Road Isle of Grain Rochester ME3 0AR (69 components)
โ€ข Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
โ€ข OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
โ€ข OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
2886.91 MW
Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (60 components)
โ€ข Staythorpe 1 - CCGT MSID: 7210
โ€ข Staythorpe 2 - CCGT MSID: 7210
โ€ข Staythorpe 4 - CCGT MSID: 7210
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
6050.24 MW
STV Lines 4 & 5 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (15 components)
โ€ข A gas fuelled generating station.
โ€ข Existing Energy from Waste Plant
โ€ข Poole Existing Site CHP
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
62.84 MW
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (22 components)
โ€ข Energy facility comprising of reciprocating engine sets and ancillary equipment.
โ€ข Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
3.93 MW
Loading map...
Showing 10 locations