Combined Heat and Power (CHP)

10 unique locations (320 components)

Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (60 components)
• Staythorpe 1 - CCGT MSID: 7210
• Staythorpe 2 - CCGT MSID: 7210
• Staythorpe 4 - CCGT MSID: 7210
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6050.24 MW
Land and Buildings Known as Teres House Copse Road And Land Lying to the North of East Denham Way Fleetwood FY7 7NY (16 components)
• A completed power plant, with associated civil works, switchgear and electrical connection.
• Heysham 2 Power Station CMU 8: [HY2823] T_HEYM28 + (50% x T_HEYM2-D)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
Active • 2027-28 (T-4), 2025-26 (T-4) ...
Hythe Power Station Charleston Road Hardley Hythe Southampton SO45 3BP (5 components)
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines . MSID: 7174
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode. MSID: 7174
• This is a long standing existing CHP unit located on land within a manufacturing site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
136.00 MW
Fielding & Johnson Building University Of Leicester University Road LEICESTER Leicestershire LE1 7RH (51 components)
• Combined Heat and Power Plant, University of Leicester, capacity of generator 1.600MW
• Combined Heat and Power Plant, University of Leicester, generator's capacity 1.600MW
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.25 MW
Elephant Park Energy Centre, Rodney Road, London, SE17 1FJ (6 components)
• A site with two gas engine CHPs providing hot water to a local district heating network
• A site with two gas engine CHPs, providing hot water to a local district heating network
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.21 MW
EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU (34 components)
• Torness Power Station CMU 1: [TN1-23] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 1: [TN1-24] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 2: [TN2-24] T_TORN-2 + (50% x T_TORN-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3068.68 MW
EDF Energy, Sizewell B power station, Nr Leiston, Suffolk, IP16 4UR (39 components)
• Sizewell B Power Station CMU 1: [SZ1-24] T_SIZB-1 + (50% x T_SIZB-D)
• Sizewell B Power Station CMU 2: [SZ2-23] T_SIZB-2 + (50% x T_SIZB-D)
• Sizewell B Power Station CMU 2: [SZ2-24] T_SIZB-2 + (50% x T_SIZB-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4640.16 MW
Drayton Garden Village CHP, Porters Way, Hillingdon, Greater London, UB7 9AA (15 components)
• A gas engine CHP site providing hot water to a local district heating network
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Pembroke 11 - CCGT MSID: 7237
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.71 MW
Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS (37 components)
• Cowes 1 - OCGT, fuel is distillate MSID: 4548
• Cowes 2 - OCGT, fuel is distillate MSID: 4548
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
498.22 MW
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (57 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• The CMU component is a combined cycle gas turbine
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3488.59 MW
Loading map...