Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

9 unique locations (359 components)

Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (22 components)
โ€ข Energy facility comprising of reciprocating engine sets and ancillary equipment.
โ€ข Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
3.93 MW
Unit 1 Lanes Farm Marlborough Road Royal Wootton Bassett Swindon SN4 7SA (15 components)
โ€ข Burnfoot East MPAN ID: 1800061120345 The CMU is an onshore windfarm connected to the distribution system.
โ€ข CHP Plant connected to Private Wire System (operated by INEOS Infrastructure (Grangemouth) Limited) with Connection to NETS
โ€ข New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active โ€ข 2027-28 (T-4), 2023-24 (T-1) ...
19.32 MW
STV Lines 4 & 5 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (15 components)
โ€ข A gas fuelled generating station.
โ€ข Existing Energy from Waste Plant
โ€ข Poole Existing Site CHP
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
62.84 MW
Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (60 components)
โ€ข Staythorpe 1 - CCGT MSID: 7210
โ€ข Staythorpe 2 - CCGT MSID: 7210
โ€ข Staythorpe 4 - CCGT MSID: 7210
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
6050.24 MW
Power Station Road Isle of Grain Rochester ME3 0AR (69 components)
โ€ข Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
โ€ข OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
โ€ข OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
2886.91 MW
Nr 125 Park Lane Cottingham East Yorkshire HU16 5RX (23 components)
โ€ข CHP at a horticultural environment.
โ€ข CHP at horticultural site
โ€ข Gas CHP engines in commercial horticultural environment with no auxilliary load
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
17.83 MW
Land At Junction With Hunsley Street and Carlisle Road, Sheffield, S4 8DQ (25 components)
โ€ข 1,000MW electricity interconnector between GB and Belgian transmission systems. The Nemo Link interconnector will consist of subsea and underground cables connected to a converter station in each country, which will allow electricity to flow in either direction between the two countries. Nemo Linkยฎ will build the converter station on an 8 hectare site, formerly occupied by the Richborough Power Station, which now forms part of the Richborough Energy Park proposals. A similar converter station will be built in the industry zone Herdersbrug in Bruges.
โ€ข Battery energy storage unit
โ€ข Two gas CHP in a horticultural environment with no aux load
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
21.52 MW
EDF Energy, Hartlepool power station, Tees Road, Hartlepool, TS25 2BZ (57 components)
โ€ข Hartlepool Power Station CMU 2: [HR2-23] T_HRTL-2
โ€ข Hartlepool Power Station CMU 2: [HR2-24] T_HRTL-2
โ€ข Hartlepool Power Station CMU 1: [HR1-24] T_HRTL-1
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
5859.76 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (73 components)
โ€ข BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
โ€ข BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
โ€ข BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
1613.68 MW
Loading map...
Showing 9 locations