Combined Heat and Power (CHP)

144 unique locations (3355 components) - Page 1 of 6

24-25 Eastern Way, Bury St Edmunds, IP32 7AD (25 components)
• CHP Unit
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
43.69 MW
2 Engineers Way, Wembley, Middlesex, HA9 0JS (10 components)

Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
24.98 MW
323 Avebury Boulevard, MILTON KEYNES MK9 2GA (16 components)
• 1.200MW BESS
• A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
• District heating implementation of two gas CHP engines with no auxilliary load
Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.27 MW
47-53 Charterhouse Street, London, EC1M 6PB (23 components)
• A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
• A site with two reciprocating gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
28.03 MW
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (90 components)
• E1000 CHP
• Existing CCGT
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
2435.45 MW
ABP Ellesmere, The Abattoir, Hordley, Ellesmere SY12 9BL, United Kingdom (17 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• ROCable hydro units within the BMU are not included in the CMU.
• Turbomach M50 Natural Gas fired CHP unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
77.42 MW
Academy CHP, Lodge Avenue, Academy Way, Dagenham, London, RM8 2JA (14 components)
• 20 x 1mw gas generator units to be installed on designated land at Stratford Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• A as engine CHP site providing hot water to a local district heating network
• A gas engine CHP site providing hot water to a local district heating network
Active • 2028-29 (T-4), 2026-27 (T-4) ...
1.20 MW
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (11 components)
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
• The new Energy Centre will consist of one Jenbacher CHP engine with a generation capacity of 3.36 MW and a thermal output of 3.984 MW.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
6.16 MW
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (15 components)
• A New Build 2.5MW Generation Battery Site
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
• Onsite load reduction and back up generation behind the meter on multiple sites
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.31 MW
Asda Edinburgh, 100 The Jewel, Brunstane, Edinburgh, EH15 3AR (13 components)
• Existing Generation on existing site - CHP
• Load curtailment from refridgeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
19.96 MW
Asda, EVESHAM ROAD, BROADWAY, WORCESTERSHIRE, WR12 7PA (9 components)
• Load reduction on site supported by non-exporting standby generation.
• One of three CHP in a horticultural environment
• This DSR component is an industrial and commercial site which can reduce its imported electricity.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
5.91 MW
Asda Witham Highfields Road, Benfield Way Lakes Road Braintree CM7 3YS (10 components)
• CHP unit
• Load reduction.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.71 MW
Asda Wrexham, Wrexham Industrial Estate Wrexham LL13 9UG (8 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, EPCO1. All Components of EMG-18, EMD-U3 and EMD-T1 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. Gross 3 HH av. peak generation from Unit 5 on separate days = 139.707 MW At these three HH times, aux load on Unit 5 = 2.517 MW Net generation from Unit 5 = 137.190 MW
Active • 2026-27 (T-4), 2022-23 (T-4) ...
1.02 MW
Barnsley Facilities Services Limited Estates & Facilities Department Gawber Road Barnsley S75 2EP (14 components)
• 1 MW CHP generation
• 30MW/30MWh one hour battery storage asset located near BURWB1 asset
• Siemens SGT200 based CHP
Active • 2026-27 (T-4), 2024-25 (T-4) ...
5.34 MW
Bath CHP, Midland Road, Bath, BA2 3EW (10 components)
• A gas engine CHP site providing hot water to a local district heating network
• BM Unit T_FFES-1 at Ffestiniog Power Station (Pumped Storage).
• To be confirmed once CMU components are known
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.59 MW
Bo'ness Road Grangemouth Stirlingshire FK3 9XQ (9 components)

CHP Plant connected to Private Wire System (operated by INEOS Infrastructure (Grangemouth) Limited) with Connection to NETS

Active • 2027-28 (T-4), 2026-27 (T-4) ...
272.58 MW
Brakes - Aylesford, Unit A, Larkfield Trading Estate, New Hythe Lane, Larkfield, AYLESFORD, Kent, ME20 6SW (25 components)
• A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
• Aggregate CMU from multiple sources
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.88 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (14 components)
• 1 * 1.7MW diesel reciporcating engine
• 1 * 1.7MW diesel reciprocating engine
• on site generating CMU
Active • 2027-28 (T-4), 2026-27 (T-4) ...
11.99 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW. (12 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• CHP Engine 3.360MW
Active • 2026-27 (T-4), 2025-26 (T-4) ...
52.75 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (46 components)
• Hamms Hall - Existing Site CHP
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• existing CHP on site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
179.28 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA (26 components)
• On-site existing CHP generating unit
• existing CHP on site.
• existing on site CHP
Active • 2027-28 (T-4), 2026-27 (T-4) ...
145.08 MW
117.41 MW
Bury St Edmunds Sugar Factory British Sugar plc Hollow Road Bury St Edmunds IP32 7BB (12 components)
• 1 x hydro turbine & synchronous generator
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The CMU is a gas fired CCGT CHP
Active • 2028-29 (T-4), 2026-27 (T-4) ...
275.68 MW
Cannon Wharf CHP, Yeoman Street, London, SE8 5DT (9 components)
• A gas engine CHP site providing hot water to a local district heating network
• BM Unit T_FFES-1 at Ffestiniog Power Station (Pumped Storage).
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
0.44 MW
Cardiff Road, Barry, Vale of Glamorgan, CF63 2YL (10 components)

Gas Turbine CHP GT001A

Active • 2026-27 (T-4), 2023-24 (T-4) ...
5.88 MW
Loading map...
Showing 25 locations