101 unique locations (1734 components) - Page 1 of 5

Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (13 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.23 MW
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (25 components)
• 2MW gas CHP engine in a horticultural environment
• One 1.354 MW gas CHP engine in a horticultural environment
• One 1.5 MW gas CHP engine in a horticultural environment
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.01 MW
167.38 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (43 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (3)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
86.63 MW
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (17 components)
• Gas CHP in a horticultiral environment providing heat for crop growth
• One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.74 MW
Westexe, Tiverton, Devon, EX16 5LL (10 components)

2026 kW CHP unit

Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.48 MW
WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (10 components)

Existing Generation on existing site - CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
36.28 MW
WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (8 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.41 MW
Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP (17 components)

Warrington Existing Site CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.02 MW
1.79 MW
0.91 MW
Treviscoe Dryer, Little Treviscoe, St. Austell, PL26 7QN (14 components)
• Gas CHP in St. Austell
• Gas fired CHP unit
Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.17 MW
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (14 components)
• Gas CHP engines 1.5MW and 1.48MW. Primary fuel type = Natural Gas
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Active • 2028-29 (T-4), 2026-27 (T-4) ...
5.59 MW
The Ridgeway Enfield, Middlesex EN2 8JL (10 components)

On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980

Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.03 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (32 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.39 MW
St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (12 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.72 MW
Staithes Road, Preston, Hull, HU12 8TB (31 components)
• CHP Unit
• CHP Unit Located at Staithes Road, Preston, Hull, HU12 8TB
• Gas fired CHP unit
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.31 MW
Stainland Boardmill, Holywell Green, Halifax, HX4 9PY (5 components)

Gas Fired CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
12.67 MW
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (18 components)

Existing Generation on existing site - CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
29.58 MW
Solvay, Trinity St, Oldbury, B69 4LW (10 components)

Existing Generation on existing site - CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
5.28 MW
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham B7 5RE (17 components)
• 8.300MW Gas Turbine installation
• 8.3MW Gas Turbine installation
Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.58 MW
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (14 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S19GT2 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S20G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.40 MW
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (25 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S20G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
184.43 MW