Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

20 unique locations (550 components)

Station Road, Wigton, Cumbria CA7 9BG (58 components)
• Back pressure steam turbine
• Gas engine
• Gas turbine
Active • 2025-26 (T-4), 2024-25 (T-4) ...
49.50 MW
Samian Way, Aston, Clinton ,Aylesbury, England, HP22 5EZ (40 components)

CHP unit

Active • 2025-26 (T-4), 2025-26 (T-1) ...
14.42 MW
2.11 MW
Pontefract Rd, Leeds, LS10 1AX (29 components)

CHP unit

Active • 2025-26 (T-4), 2025-26 (T-1) ...
17.16 MW
69.52 MW
Oakthorpe Dairy, Chequers Way, Palmers Green, London, England, N13 6DA (9 components)

CHP unit - 1 x 2,000kw

Active • 2025-26 (T-4), 2024-25 (T-4) ...
5.14 MW
Lockerbie Creamery, Lockerbie, England. DG11 1LW (22 components)

CHP unit

Active • 2025-26 (T-4), 2024-25 (T-4) ...
5.09 MW
Church Manorway, Erith DA8 1DL (60 components)

gas-fired CHP unit

Active • 2025-26 (T-4), 2024-25 (T-1) ...
27.67 MW
Cargill PLC, Trafford Park, Manchester, M17 1PA (75 components)
• Siemens SGT200 based CHP
• Solar T70 Based CHP System
• Solar T70 based CHP system
Active • 2028-29 (T-4), 2027-28 (T-4) ...
82.17 MW
Cargill PLC, Trafford Park, M17 1PA (26 components)

Siemens SGT200 Based CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
25.88 MW
24-25 Eastern Way, Bury St Edmunds, IP32 7AD (23 components)

CHP Unit (3)

Active • 2025-26 (T-4), 2025-26 (T-1) ...
47.40 MW
1 Thane Road West, Nottingham, NG2 3AA (128 components)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA (2)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
58.18 MW
Loading map...
Showing 20 locations