Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

10 unique locations (385 components)

Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (60 components)
โ€ข Staythorpe 1 - CCGT MSID: 7210
โ€ข Staythorpe 2 - CCGT MSID: 7210
โ€ข Staythorpe 4 - CCGT MSID: 7210
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
6050.24 MW
Royal South Hants Hospital, Graham Road, Southampton, Hampshire, SO14 0YG (23 components)
โ€ข 0.725MW Combined Heat and Power Plant Royal South Hants Hospital
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active โ€ข 2025-26 (T-4), 2024-25 (T-4) ...
47.83 MW
Power Station Road Isle of Grain Rochester ME3 0AR (69 components)
โ€ข Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
โ€ข OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
โ€ข OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
2886.91 MW
Nr 125 Park Lane Cottingham East Yorkshire HU16 5RX (23 components)
โ€ข CHP at a horticultural environment.
โ€ข CHP at horticultural site
โ€ข Gas CHP engines in commercial horticultural environment with no auxilliary load
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
17.83 MW
Langstone Power Generation Plant, Southmoor Lane, Havant, Hampshire, PO9 1JW (10 components)
โ€ข Grain B CCGT Unit 6 CHP element is via supply of heat to Grain LNG regasification facility
โ€ข Municipal waste incineration plant located in Chineham Hampshire. It is based on one boiler supplying steam to a turbine-generator.
โ€ข New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active โ€ข 2026-27 (T-4), 2025-26 (T-4) ...
19.05 MW
Land At Junction With Hunsley Street and Carlisle Road, Sheffield, S4 8DQ (25 components)
โ€ข 1,000MW electricity interconnector between GB and Belgian transmission systems. The Nemo Link interconnector will consist of subsea and underground cables connected to a converter station in each country, which will allow electricity to flow in either direction between the two countries. Nemo Linkยฎ will build the converter station on an 8 hectare site, formerly occupied by the Richborough Power Station, which now forms part of the Richborough Energy Park proposals. A similar converter station will be built in the industry zone Herdersbrug in Bruges.
โ€ข Battery energy storage unit
โ€ข Two gas CHP in a horticultural environment with no aux load
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
21.52 MW
EDF Energy, Hartlepool power station, Tees Road, Hartlepool, TS25 2BZ (57 components)
โ€ข Hartlepool Power Station CMU 2: [HR2-23] T_HRTL-2
โ€ข Hartlepool Power Station CMU 2: [HR2-24] T_HRTL-2
โ€ข Hartlepool Power Station CMU 1: [HR1-24] T_HRTL-1
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
5859.76 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (73 components)
โ€ข BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
โ€ข BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
โ€ข BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
1613.68 MW
Chase Hill Road Killingholme North Lincolnshire DN40 3LU (35 components)
โ€ข A 7.5MW Tesla Battery Energy Storage System
โ€ข Killingholme Module 1 converted to open cycle operation
โ€ข Killingholme Module 2 converted to open cycle operation
Active โ€ข 2028-29 (T-4), 2026-27 (T-4) ...
2098.53 MW
Asda Witham Highfields Road, Benfield Way Lakes Road Braintree CM7 3YS (10 components)
โ€ข CHP unit
โ€ข Load reduction.
โ€ข New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active โ€ข 2026-27 (T-4), 2025-26 (T-4) ...
5.71 MW
Loading map...
Showing 10 locations