Combined Heat and Power (CHP)

85 unique locations (1171 components) - Page 1 of 4

100 Montifichet Road, Westfield, Stratford E20 1GR (60 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
253.39 MW
17 Oak Tree Road, Fen Drayton, Cambridge, CB24 4SS (3 components)

2 x gas fired CHP generators located at a horticultural site. (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
8.21 MW
24-25 Eastern Way, Bury St Edmunds, IP32 7AD (23 components)

CHP Unit (3)

Active • 2025-26 (T-4), 2025-26 (T-1) ...
47.40 MW
2 Engineers Way, Wembley, Middlesex, HA9 0JS (9 components)

Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
24.78 MW
2 Samworth Way, Melton Mowbray LE13 1GA (9 components)

Existing Generation on existing site - CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.00 MW
66 Molesworth Street, London SE13 7EY (21 components)
• Gas fired CHP unit (2)
• Behind the Meter CHP Unit
Active • 2025-26 (T-1), 2024-25 (T-1) ...
50.19 MW
2.28 MW
Alderley Park Limited, Alderley Park, Congleton Road, Nether Alderley, Macclesfield, SK10 4TF. (1 component)

1 X gas engine with a gross capacity of 5.400 MW at MCR and ISO conditions

Active • 2025-26 (T-1)
3.23 MW
Aspatria Creamery/Station Rd, Wigton CA7 2AR (9 components)

Existing Generation on existing site - CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.84 MW
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (44 components)
• !MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.50 MW
BATTERSEA POWER STATION BATTERSEA POWER STATION LONDON LONDON SW11 8AH (4 components)

Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the …

Active • 2025-26 (T-1)
6.93 MW
BATTERSEA POWER STATION LONDON SW11 8AH (8 components)

Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.19 MW
Belliver Way, Roborough, Plymouth, PL6 7BP (6 components)
• 2025 KW gas fire engine
• 2025kW gas engine
Active • 2028-29 (T-4), 2025-26 (T-1) ...
7.37 MW
Briar Chemicals, Sweet Briar Rd, Norwich NR6 5AP (1 component)

Behind the Meter CHP Unit

Active • 2025-26 (T-1)
1.82 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (36 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• existing CHP on site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
41.13 MW
Broadgreen Hospital, Thomas Drive, Liverpool L14 3LB (18 components)
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.000 MW and total net power capacity of 1.949 MW
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.000 MW and total net power capacity of 1.970 MW
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.133 MW.
• ... and 2 more unique descriptions
Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.39 MW
Buxton Road, Hindlow, Buxton, SK17 0EL (1 component)

Generating unit

Active • 2025-26 (T-1)
1.65 MW
Cashmere Works, Birksland Street, Bradford, West Yorkshire, BD3 9SX (4 components)

On-Site Generating CMU

Active • 2028-29 (T-4), 2025-26 (T-1) ...
4.04 MW
Chryston, Moodiesburn, Glasgow G69 0JE (6 components)

On-site Generating CMU.

Active • 2028-29 (T-4), 2025-26 (T-1) ...
8.20 MW
CORPORATION ROAD NEWPORT NP19 4XF (2 components)

Gas fired CHP at Corporation Road

Active • 2025-26 (T-1), 2024-25 (T-1)
3.34 MW
Denmark Hill, Brixton, London, SE5 9RS (15 components)
• Behind the Meter CHP Unit
• CHP unit
• Gas fired CHP unit
Active • 2025-26 (T-1), 2023-24 (T-4) ...
3.86 MW
Dunswell Lane, Cottingham, Hull HU16 4JT (2 components)

1 x 1,400kW gas fired CHP at a horticultural site. Maximum Export capacity of connection agreement is 1,400MW.

Active • 2028-29 (T-4), 2025-26 (T-1)
1.91 MW
Ellifoot Lane, Burstwick, HU12 9EB (7 components)
• A Distribution Connected 4.5MW gas fueled generating station
• a Combined Heat and Power Plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
29.03 MW
Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (36 components)
• TG1B is part of the aggregated CMU EMD-18, which is made up of 2 Generating Units of which TG1B is the larger. This Generating Unit is embedded in the 'E_FAWND BMU' and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of 'EMD-18' are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power and steam generation units on the site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (part of MSID 7095). Both Unit 3 and TG1B units share various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. There is a project currently in construction phase to install separate metering for the auxiliary power for both TG1B and Unit 3. This will provide half hourly meters for the auxiliary load for the two units, these will be installed in time to pass a Metering Test for the delivery of this Capacity Market (they are planned for completion on 28th September 2018). This was previously agreed with the settlements body as part of an appeal process for the T-4 2018 capacity market auction. In this appeal the capacity market settlements body accepted ExxonMobil's appeal for the auxiliary meters to be installed in time for the capacity market delivery period 2018/19 i.e. 1st October 2018. For now, using the same method as for the T4 -2018 Capacity Market, (with the successful appeal) we have determined the auxiliary load for TG1B to be 2.024 MW (based on the total auxiliary consumption over the three Highest TG1B+Unit 3 Generation points) which represents on average 7.954% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 7.954/3 = 2.6513% of MSID 7096, thus 2.024 MW. (NB. the rest of MSID 7095 is made up of one of our other components of our CMU- i.e. Unit 3). To clarify the 3 units within the refinery boundary, they are Unit 5 (EMG-18) and TG1B and Unit 3 (which make up EMD-18). Unit 5 now has half hourly meters installed on the auxiliary load so the estimate on auxiliary load for now is only for Unit 3 and TG1B. This will move to half hourly metering for Unit 3 and TG1B once the auxiliary load meters are installed by 28th September 2018. Gross 3 HH av. peak generation from TG1B on separate days = 56.634 MW At these three HH times, aux load on TG1B = 2.024 MW Net generation from TG1B = 54.610 MW
• TG1B is part of the aggregated CMU EMD-19, which is made up of 2 Generating Units of which TG1B is the larger. This Generating Unit is embedded in the 'E_FAWND' BMU and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of 'EMD-19' are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power generation units on the site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (part of MSID 7095). Both Unit 3 and TG1B units share various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested. To clarify the 3 units within the refinery boundary, they are Unit 5 (EMG-19) and TG1B and Unit 3 (which make up EMD-19). Gross 3 HH av. peak generation from TG1B on separate days = 49.863 MW At these three HH times, aux load on TG1B = -1.468 MW Net generation from TG1B = 48.394 MW
• TG1B is part of the aggregated CMU EMD-20, which is made up of 2 Generating Units of which TG1B is the larger. This Generating Unit is embedded in the 'E_FAWND' BMU and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of 'EMD-20' are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power generation units on the site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (part of MSID 7095). Both Unit 3 and TG1B units share various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested. To clarify the 3 units within the refinery boundary, they are Unit 5 (EMG-20) and TG1B and Unit 3 (which make up EMD-20). Gross 3 HH av. peak generation from TG1B on separate days = 49.863 MW At these three HH times, aux load on TG1B = -1.468 MW Net generation from TG1B = 48.394 MW The 48.394MW described above is the historical proven capacity. However, based on the planned future availability of this unit, we wish to submit a conservative 18MW connection capacity. To clarify the numbers provided in the application page are in half hourly periods, as the units specified were MWh and therefore reporting half hourly period was required.
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
300.51 MW
Estates & Facilities, North Devon District Hospital, Raleigh Park, Barnstaple, EX31 4JB (2 components)

1 x gas reciprocating engine with a total rated gross power capacity of 0.800 MW

Active • 2028-29 (T-4), 2025-26 (T-1)
1.45 MW