Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

98 unique locations (644 components) - Page 1 of 4

Active MW: 39912.66 MW
Inactive MW: 1392.68 MW
Young's House, Wickham Road, Grimsby DN32 8HW (4 components)
• On-site Generating CMU
• on site generating CMU
Active • 2028-29 (T-4), 2025-26 (T-1) ...
8.22 MW
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (18 components)
• 2MW gas CHP engine in a horticultural environment
• One 1.5 MW gas CHP engine in a horticultural environment
• One 2MW gas CHP engine in a horticultural environment
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX110 FLEX110 +5 more WA16
Active • 2028-29 (T-4), 2027-28 (T-4) ...
25.64 MW
Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP (11 components)

Warrington Existing Site CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
13.64 MW
3.62 MW
TOTAL LINDSEY OIL REFINERY LTD, EASTFIELD ROAD, NORTH KILLINGHOLME, IMMINGHAM, DN40 3LW (6 components)
• On-Site Generating CMU.
• On-Site Generating Steam Turbine, utilising heat recovery waste as a 'fuel input' and generating electricity w/o fossil fuel emissions.
• On-Site Generating Steam Turbine, utilising high pressure steam waste from on-site refinery processes as a 'fuel input' and generating electricity w/o fossil fuel emissions.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
90.46 MW
The Heat Station, Harbour Parade, Southampton, Hampshire, SO15 1BA (24 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
Active • 2025-26 (T-4), 2025-26 (T-1) ...
28.00 MW
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (10 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks (2)
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
9.91 MW
Telford Dairy Limited, Donnington Wood Business Park, Telford, Shropshire, TF2 7GJ (4 components)

On-Site Generating CMU

Active • 2028-29 (T-4), 2025-26 (T-4) ...
7.37 MW
Stubbins Hall Lane Waltham Abbey Essex EN9 2EE (6 components)
• Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market purposes
• Two gas CHP engines 1.54MW. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2025-26 (T-4) ...
6.29 MW
Stubbins Hall Lane Waltham Abbey Essex EN9 2EE (6 components)

Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market purposes (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
2.89 MW
St Marks Boilerhouse, Donaldson Road, LEICESTER, Leicestershire LE4 6BF (13 components)

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.88 MW
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (4 components)

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the … (3)

Active • 2025-26 (T-1), 2019-20 (T-1) ...
1.35 MW
Staverton, Trowbridge, BA14 6PG (1 component)

Turbomach M50 Natural Gas fired CHP unit

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GCMU07 BA14
Active • 2025-26 (T-1)
4.47 MW
Staithes Road, Preston, East Riding of Yorkshire HU12 8TB (2 components)

On-Site Generating CMU.

Active • 2025-26 (T-4), 2025-26 (T-1)
1.97 MW
Speke Blvd, Speke, Liverpool L24 9LE (3 components)
• On-site Generating CMU
• on site generating CMU
Active • 2025-26 (T-1), 2024-25 (T-1) ...
9.61 MW
Southport & Formby District General Hospital, Town Lane Kew, Southport PR8 6PN (2 components)

1 x gas reciprocating engine with a total rated gross power capacity of 0.995 MW and a net power capacity of 0.961 MW

Combined Heat and Power (CHP) VEOLIA UK LIMITED Existing Generating CMU Ormskirk, Southport & North Devon Hospitals PR8
Active • 2028-29 (T-4), 2025-26 (T-1)
1.73 MW
Southampton General Hospital Tremona Road, Southampton, SO16 6YD (9 components)
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW and a net power capacity of 3.953 MW.
• 2X gas reciprocating engines with a total gross power capacity of 3.973 MW
CHP and autogeneration Combined Heat and Power (CHP) VEOLIA UK LIMITED Existing Generating CMU Southampton General Hospital Southampton General Hospital +2 more SO16
Active • 2028-29 (T-4), 2027-28 (T-4) ...
20.83 MW
Snodland Paper Mill, Mill Street, Snodland, Kent, ME6 5AX (3 components)

On-site Generating CMU.

Active • 2028-29 (T-4), 2025-26 (T-1) ...
28.42 MW
Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (10 components)
• Gas CHP in horticultural environment providing heat & electricity for crop growth
• One asset 1.13MW CHP engine in a horticultural environment with no auxiliary load.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
14.01 MW
Samworth Brothers, 81-83 Tavistock Road, Callington, Cornwall, PL17 7TA (11 components)

Callington - Existing Site CHP unit

Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.74 MW
Royal Liverpool University Hospital, Prescott Street, Liverpool L7 8XP (11 components)
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.241 MW and total net power capacity of 5.050 MW.
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.362 MW and total net power capacity of 5.290 MW.
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.362 MW and total net power capacity of 5.302 MW.
CHP and autogeneration Combined Heat and Power (CHP) VEOLIA UK LIMITED Existing Generating CMU Royal Liverpool & Broadgreen Hospitals Royal Liverpool & Broadgreen Hospitals +5 more L7
Active • 2026-27 (T-4), 2025-26 (T-4) ...
41.97 MW
Repton Rd (Adjacent to Plastic Omnium Site), Measham DE12 7DT (2 components)

On-Site Generating CMU.

Active • 2025-26 (T-4), 2025-26 (T-1)
1.89 MW
3.27 MW
Poole Sustainable Energy LTD, Sterte Ave, Poole, Dorset, BH15 2AS (11 components)

Poole Existing Site CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.62 MW
Pembroke Rd, Merlin's Bridge, Haverfordwest SA61 1JN (6 components)

Existing Generation on existing site - CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.67 MW
Loading map...
Showing 25 locations