76 unique locations (1396 components) - Page 1 of 4

1345 Govan Rd., Glasgow, G51 4TF (8 components)

CHPs at Queen Elizabeth Hospital (3)

Active • 2024-25 (T-1), 2023-24 (T-1) ...
17.06 MW
1 Thane Road West, Nottingham, NG2 3AA (128 components)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA (2)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
58.18 MW
2 Engineers Way, Wembley, Middlesex, HA9 0JS (9 components)

Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
24.78 MW
2 Samworth Way, Melton Mowbray LE13 1GA (9 components)

Existing Generation on existing site - CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.00 MW
46 Station Road Stokesley Middlesbrough TS9 7AA (14 components)
• Gas CHP engines in commercial horticultural usage with no auxilliary load (2)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
Active • 2027-28 (T-4), 2025-26 (T-4) ...
57.19 MW
530 London Road, Croydon, CR7 7YE (9 components)

Gas fired CHP unit (3)

Active • 2024-25 (T-1), 2023-24 (T-1) ...
12.61 MW
66 Molesworth Street, London SE13 7EY (21 components)
• Gas fired CHP unit (2)
• Behind the Meter CHP Unit
Active • 2025-26 (T-1), 2024-25 (T-1) ...
50.19 MW
Aspatria Creamery/Station Rd, Wigton CA7 2AR (9 components)

Existing Generation on existing site - CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.84 MW
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (44 components)
• !MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.27 MW
Bar Ln, Boroughbridge, Roecliffe, York YO51 9NN (6 components)

on site generating CMU

Active • 2027-28 (T-4), 2025-26 (T-4) ...
5.39 MW
BATTERSEA POWER STATION LONDON SW11 8AH (8 components)

Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.19 MW
Belliver Way, Roborough, Plymouth, PL6 7BP (6 components)
• 2025 KW gas fire engine
• 2025kW gas engine
Active • 2028-29 (T-4), 2025-26 (T-1) ...
7.37 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (36 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• existing CHP on site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
70.43 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA (20 components)
• existing CHP on site.
• existing on site CHP
Active • 2027-28 (T-4), 2026-27 (T-4) ...
57.58 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA. (20 components)
• existing on site CHP
• existing onsite CHP
Active • 2027-28 (T-4), 2026-27 (T-4) ...
92.43 MW
Cashmere Works, Birksland Street, Bradford, West Yorkshire, BD3 9SX (4 components)

On-Site Generating CMU

Active • 2028-29 (T-4), 2025-26 (T-1) ...
4.04 MW
Chryston, Moodiesburn, Glasgow G69 0JE (6 components)

On-site Generating CMU.

Active • 2028-29 (T-4), 2025-26 (T-1) ...
8.20 MW
Church Manorway, Erith DA8 1DL (60 components)

gas-fired CHP unit

Active • 2025-26 (T-4), 2024-25 (T-1) ...
27.67 MW
Clough Green, Cawthorne, Barnsley, S75 4AD (5 components)

On-site Generating CMU.

Active • 2025-26 (T-4), 2024-25 (T-1)
1.89 MW
CORPORATION ROAD NEWPORT NP19 4XF (2 components)

Gas fired CHP at Corporation Road

Active • 2025-26 (T-1), 2024-25 (T-1)
3.34 MW
Dalmarnock, 120 Cotton Street, Glasgow, G40 4HU (6 components)

CHP at a water treatment works in Glasgow.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Darent Valley Hospital, Darenth Wood Rd, Dartford, DA2 8DA (9 components)

1280 KWe Combined Heat and Power unit.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.15 MW
Drakemyre, Dalry KA24 5JJ (33 components)
• Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• One 22.9MVA gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2026-27 (T-4) ...
42.42 MW
Ellifoot Lane, Burstwick, HU12 9EB (7 components)
• A Distribution Connected 4.5MW gas fueled generating station
• a Combined Heat and Power Plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
29.03 MW
Engie Great Coates, Grimsby, DN31 2TT (40 components)

Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the …

Active • 2024-25 (T-1), 2023-24 (T-1) ...
20.70 MW
Loading map...
Showing 25 locations