Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

76 unique locations (1396 components) - Page 1 of 4

Young's House, Wickham Road, Grimsby DN32 8HW (8 components)
• On-site Generating CMU
• on site generating CMU
Active • 2028-29 (T-4), 2025-26 (T-1) ...
10.94 MW
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (25 components)
• 2MW gas CHP engine in a horticultural environment
• One 1.354 MW gas CHP engine in a horticultural environment
• One 1.5 MW gas CHP engine in a horticultural environment
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.01 MW
WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (10 components)

Existing Generation on existing site - CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
36.28 MW
Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP (17 components)

Warrington Existing Site CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.02 MW
TOTAL LINDSEY OIL REFINERY LTD, EASTFIELD ROAD, NORTH KILLINGHOLME, IMMINGHAM, DN40 3LW (9 components)
• On-Site Generating CMU.
• On-Site Generating Steam Turbine, utilising heat recovery waste as a 'fuel input' and generating electricity w/o fossil fuel emissions.
• On-Site Generating Steam Turbine, utilising high pressure steam waste from on-site refinery processes as a 'fuel input' and generating electricity w/o fossil fuel emissions.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
79.21 MW
The Royal Marsden NHS Foundation Trust, Downs Road, Sutton, SM2 5PT (7 components)
• CHP
• Gas Fired - CHP
Active • 2024-25 (T-1), 2023-24 (T-4) ...
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (41 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
9.88 MW
5.09 MW
Stoneykirk Road, Stranraer, DG9 7BU (23 components)
• CHP unit
• Gas fired CHP unit
Active • 2024-25 (T-1), 2023-24 (T-1) ...
7.16 MW
Station Road, Wigton, Cumbria CA7 9BG (58 components)
• Back pressure steam turbine
• Gas engine
• Gas turbine
Active • 2025-26 (T-4), 2024-25 (T-4) ...
41.32 MW
Staithes Road, Preston, Hull, HU12 8TB (31 components)
• CHP Unit
• CHP Unit Located at Staithes Road, Preston, Hull, HU12 8TB
• Gas fired CHP unit
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.31 MW
Speke Blvd, Speke, Liverpool L24 9LE (6 components)
• On-site Generating CMU
• on site generating CMU
Active • 2025-26 (T-1), 2024-25 (T-1) ...
12.80 MW
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (18 components)

Existing Generation on existing site - CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
29.58 MW
Southampton General Hospital Tremona Road, Southampton, SO16 6YD (14 components)
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW and a net power capacity of 3.953 MW.
• 2*2 gas reciprocating engines with a total gross power capacity of 4.00 MW and a net power capacity of 3.960 MW.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
17.63 MW
Solvay, Trinity St, Oldbury, B69 4LW (10 components)

Existing Generation on existing site - CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
5.28 MW
Solenis, Cleckheaton Road, Low Moor, Bradford, United Kingdom, BD12 0JZ (15 components)
• Gas Turbine CHP unit
• Steam turbine
Active • 2025-26 (T-1), 2024-25 (T-1) ...
10.10 MW
Snodland Paper Mill, Mill Street, Snodland, Kent, ME6 5AX (7 components)

On-site Generating CMU.

Active • 2028-29 (T-4), 2025-26 (T-1) ...
56.83 MW
Slough Nurseries, Rochford Gardens, Uxbridge Road, Slough SL2 5NU (5 components)

One 2MW gas CHP engine in a horticultural environment

Active • 2027-28 (T-4), 2024-25 (T-1) ...
5.29 MW
15.54 MW
Samworth Brothers, 81-83 Tavistock Road, Callington, Cornwall, PL17 7TA (17 components)

Callington - Existing Site CHP unit

Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.29 MW
Samian Way, Aston, Clinton ,Aylesbury, England, HP22 5EZ (40 components)

CHP unit

Active • 2025-26 (T-4), 2025-26 (T-1) ...
9.02 MW
2.11 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
• New build gas reciprocating multi-engine generating plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3439.50 MW
Repton Road, Measham, Swadlincote, DE12 7DT (20 components)
• CHP unit
• Gas fired CHP unit
Active • 2024-25 (T-1), 2023-24 (T-1) ...
3.51 MW
Loading map...
Showing 25 locations