Combined Heat and Power (CHP)

139 unique locations (2615 components) - Page 1 of 6

Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (13 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.23 MW
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (25 components)
• 2MW gas CHP engine in a horticultural environment
• One 1.354 MW gas CHP engine in a horticultural environment
• One 1.5 MW gas CHP engine in a horticultural environment
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.01 MW
167.38 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (43 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (3)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
86.63 MW
Wight Salads Arreton Newport Isle of Wight PO30 3AR (6 components)

The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be the technology used

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (17 components)
• Gas CHP in a horticultiral environment providing heat for crop growth
• One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.74 MW
WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (8 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.41 MW
University of Warwick, Coventry, CV4 7AL (63 components)
• One of six CHP units at University of Warwick, Coventry, CV4 7AL
• One of six CHP units at University of Warwick, Coventry, CV4 7AL.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
38.98 MW
Treviscoe Dryer, Little Treviscoe, St. Austell, PL26 7QN (14 components)
• Gas CHP in St. Austell
• Gas fired CHP unit
Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.17 MW
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (14 components)
• Gas CHP engines 1.5MW and 1.48MW. Primary fuel type = Natural Gas
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Active • 2028-29 (T-4), 2026-27 (T-4) ...
5.59 MW
T&L Sugars Limited, Thames Refinery, Factory Road, Silvertown, London, United Kingdom, E16 2EW (47 components)
• No2 Steam turbine - Allen Steam Turbines/NG Model MB510 - 2009 - Nominal power rating 14500kWe
• No5 Gas Turbine - European Gas Turbines SGT200 'Tornado' - S765/01 1997 - Nominal power output 6000kWe
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
66.18 MW
The Royal Marsden NHS Foundation Trust, Downs Road, Sutton, SM2 5PT (7 components)
• CHP
• Gas Fired - CHP
Active • 2024-25 (T-1), 2023-24 (T-4) ...
The Ridgeway Enfield, Middlesex EN2 8JL (10 components)

On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980

Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.03 MW
The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (19 components)
• Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• Three CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• Three engines of 2.65MW each all CHP engine in a horticultural environment, exporting excess generation to distribution network. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2025-26 (T-4) ...
6.37 MW
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (41 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
21.41 MW
Thearne Lane Woodmansey Beverley HU17 0SA (7 components)
• Gas CHP engines in commercial horticultural environment with no auxilliary load
• Two gas CHP engines in commercial horticultural environment with no auxilliary load
Active • 2027-28 (T-4), 2025-26 (T-4) ...
1.05 MW
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (12 components)
• CHP engine in horticultural environment with no auxilliary load
• Two CHP engines in horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2025-26 (T-4) ...
11.64 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (32 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.39 MW
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (17 components)

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.10 MW
Station Road, Wigton, Cumbria CA7 9BG (58 components)
• Back pressure steam turbine
• Gas engine
• Gas turbine
Active • 2025-26 (T-4), 2024-25 (T-4) ...
49.50 MW
St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (12 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.72 MW
Speke Operations, Fleming Rd, Liverpool L24 9LN (9 components)
• 2 x gas turbines with a total rated gross power capacity of 6.830 MW and total net power capacity of 6.807
• Speke combined heat and power plant.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 25 locations