Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

87 unique locations (1615 components) - Page 1 of 4

1345 Govan Rd., Glasgow, G51 4TF (8 components)

CHPs at Queen Elizabeth Hospital (3)

Active • 2024-25 (T-1), 2023-24 (T-1) ...
17.06 MW
1 Thane Road West, Nottingham, NG2 3AA (128 components)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA (2)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
477.82 MW
24-25 Eastern Way, Bury St Edmunds, IP32 7AD (23 components)

CHP Unit (3)

Active • 2025-26 (T-4), 2025-26 (T-1) ...
47.40 MW
2 Samworth Way, Melton Mowbray LE13 1GA (9 components)

Existing Generation on existing site - CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.00 MW
530 London Road, Croydon, CR7 7YE (9 components)

Gas fired CHP unit (3)

Active • 2024-25 (T-1), 2023-24 (T-1) ...
12.61 MW
66 Molesworth Street, London SE13 7EY (21 components)
• Gas fired CHP unit (2)
• Behind the Meter CHP Unit
Active • 2025-26 (T-1), 2024-25 (T-1) ...
50.19 MW
Aspatria Creamery/Station Rd, Wigton CA7 2AR (9 components)

Existing Generation on existing site - CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.84 MW
Bar Ln, Boroughbridge, Roecliffe, York YO51 9NN (6 components)

on site generating CMU

Active • 2027-28 (T-4), 2025-26 (T-4) ...
5.39 MW
Barrack Road, Exeter, EX2 5DW. (7 components)

1.521 MW CHP unit

Active • 2026-27 (T-4), 2024-25 (T-4) ...
3.93 MW
12.26 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (36 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• existing CHP on site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
41.13 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA (20 components)
• existing CHP on site.
• existing on site CHP
Active • 2027-28 (T-4), 2026-27 (T-4) ...
57.58 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA. (20 components)
• existing on site CHP
• existing onsite CHP
Active • 2027-28 (T-4), 2026-27 (T-4) ...
92.43 MW
Burnside Mills, Kendal,Cumbria,LA9 6PZ (10 components)

Gas fired CHP unit

Active • 2026-27 (T-4), 2025-26 (T-4) ...
16.37 MW
Church Manorway, Erith DA8 1DL (60 components)

gas-fired CHP unit

Active • 2025-26 (T-4), 2024-25 (T-1) ...
12.58 MW
Denison road, Selby, North Yorkshire, YO8 8AN. (12 components)

Gas Turbine Cogeneration Unit GT3

Active • 2026-27 (T-4), 2025-26 (T-4) ...
28.01 MW
Drakemyre, Dalry KA24 5JJ (33 components)
• Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• One 22.9MVA gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2026-27 (T-4) ...
55.08 MW
DS Smith Paper Limited, Kemsley Paper Mill, Sittingbourne, Kent, ME10 2TD (29 components)
• A gas turbine generating unit, part of a CHP which supplies heat & power to a paper mill
• A gas turbine generating unit, part of a CHP which supplies heat & power to a paper mill
• A steam turbine generating unit, part of a CHP which supplies heat & power to a paper mill
Active • 2025-26 (T-4), 2024-25 (T-4) ...
134.46 MW
Energy Centre, Lower Mosley Street, Manchester M2 3GX (12 components)

A 3.36MW gas fired reciprocating engine CHP.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
8.96 MW
Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX (11 components)
• VIT303 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX
• VIT503 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX
Active • 2024-25 (T-4), 2023-24 (T-1) ...
9.04 MW
Engie Great Coates, Grimsby, DN31 2TT (40 components)

Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the …

Active • 2024-25 (T-1), 2023-24 (T-1) ...
5.13 MW
Engie Great Coates, Grimsby, DN31 2TT (8 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
2.05 MW
Engie Great Coates, Grimsby, DN31 2TT (19 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
Active • 2024-25 (T-1), 2023-24 (T-1) ...
2.05 MW
Galley Hill Road Waltham Abbey Essex EN9 2AG (20 components)
• Gas CHP engines 1.37MW and 1.50MW. Primary fuel type = Natural Gas
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Active • 2028-29 (T-4), 2025-26 (T-4) ...
3.71 MW
Loading map...
Showing 25 locations