T&L Sugars Limited, Thames Refinery, Factory Road, Silvertown, London, United Kingdom, E16 2EW (51 components)
• A new build, gas fuelled generation station.
• No2 Steam turbine - Allen Steam Turbines/NG Model MB510 - 2009 - Nominal power rating 14500kWe
• No5 Gas Turbine - European Gas Turbines SGT200 'Tornado' - S765/01 1997 - Nominal power output 6000kWe
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
52.83 MW
Slough Nurseries, Rochford Gardens, Uxbridge Road, Slough SL2 5NU (5 components)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• One 2MW gas CHP engine in a horticultural environment
Active • 2024-25 (T-1), 2023-24 (T-1) ...
7.05 MW
Rotherdale Farm, Long Lane, Throckmorton, Worcestershire, United Kingdom, WR10 2JH (47 components)
• A gas engine CHP site providing hot water to a local district heating network
• One of three CHP in a horticultural environment
• One of three CHP in a horticultural environment.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
38.34 MW
Redditch Generation Station Windsor Road Redditch B97 6HE (6 components)
• Gas turbine generator
• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
Active • 2024-25 (T-1), 2023-24 (T-1) ...
69.82 MW
Pudding Lane Spalding, Lincs, PE11 3TJ (2 components)
• Load curtailment and standby generation
• Warrington Existing Site CHP
Inactive • 2023-24 (T-1), 2017-18 (T-1)
0.81 MW
Pandora Business Park Greengate Middleton Manchester M24 1RU (11 components)
• District heating implementation of two gas CHP engines with no auxilliary load
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
31.68 MW
Norwich East Electric Forecourt Broadland Gate Norwich NR13 5HB (7 components)
• 6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt
• A Prospective New Build Gas reciprocating energy reserve facility
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2025-26 (T-1), 2023-24 (T-1) ...
3.46 MW
Northmoor Lane, Cottingham, Hull HU16 4JN (5 components)

one CHP (1.9MW rating) in a horticulatural environment with no aux load

Active • 2027-28 (T-4), 2023-24 (T-1) ...
6.94 MW
Millfield Lane Haydock Industrial Estate Haydock St Helens WA11 9UT (13 components)
• A completed power plant, with associated civil works, switchgear and electrical connection.
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
• The CMU comprises of Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
30.98 MW
Maentwrog Power Station Magnox Ltd Maentwrog nr Blaenau Ffestiniog Gwynedd LL414HY UK (15 components)
• Battery energy storage unit
• Gas CHP engines in commercial horticultural environment with no auxilliary load
• Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd Reservoir. The plant is restricted to the quantity of water it can use as minimum water levels must be maintained in the resevoir. The plant has a connection capacity of 35300kVA and an associated power factor of 0.85.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
80.39 MW
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (10 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
31.39 MW
Land South of NG Capenhurst Substation, Capenhurst Lane, Capenhurst, Cheshire, CH1 6HE (35 components)
• 4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Existing Generation CMU - Onshore Wind. Connected at WesterDod 132kV substation.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
128.11 MW
LAND ON THE NORTH SIDE OF DESFORD ROAD, ENDERBY, LEICESTER, LE19 3LR (18 components)
• Battery Storage Plant
• Small gas fired OCGT.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
98.37 MW
Land at Union Street, Masbrough, Rotherham, S61 1AA (10 components)
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Reciprocating genset in acoustic enclosure
Active • 2028-29 (T-4), 2027-28 (T-4) ...
52.26 MW
entre Bailey Road,Central Park, Rugby CV23 0PD (3 components)
• Hamms Hall - Existing Site CHP
• Load curtailment & standby generation
Inactive • 2023-24 (T-1), 2020-21 (T-4) ...
1.08 MW
Energy Centre, Lower Mosley Street, Manchester M2 3GX (12 components)
• A 3.36MW gas fired reciprocating engine CHP.
• The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
11.95 MW
DS Smith Paper Limited, Kemsley Paper Mill, Sittingbourne, Kent, ME10 2TD (30 components)
• A 49MW New Build Battery Storage Site.
• A gas turbine generating unit, part of a CHP which supplies heat & power to a paper mill
• A steam turbine generating unit, part of a CHP which supplies heat & power to a paper mill
Inactive • 2023-24 (T-1), 2022-23 (T-4) ...
214.92 MW
Drakemyre, Dalry KA24 5JJ (30 components)
• Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• One 22.9MVA gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2026-27 (T-4) ...
83.08 MW
Combe Park, Bath, BA1 3NG (2 components)
• Poole Existing Site CHP
• Standby generation x 2
Inactive • 2023-24 (T-1), 2017-18 (T-1)
1.32 MW
117.41 MW
Asda Workington Moss Bay Road, Moss Bay Road, , Workington, CA14 5AB (11 components)
• Load curtailment
• Load curtailment from refridgeration
• Two CHP engines in horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.05 MW
Asda Straiton, Bush Estate, Penicuik EH26 0QA (8 components)
• Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the combined peak of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
• Load reduction on site supported by standby generation
• Standby generation reducing load
Active • 2028-29 (T-4), 2024-25 (T-4) ...
3.89 MW
Asda Stoneycroft, Regent House Green Lane, Stoneycroft, L13 6RH (12 components)
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.11 MW
Asda Stonecot, Stonecot Hill SM3 9HB (8 components)
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
24.35 MW
Asda, Scalley Way Raunds NN9 6EQ (10 components)
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
24.41 MW