2 unique locations (55 components)

Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (28 components)
• The CMU component JENBA1 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
• The CMU component JENBA2 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
• The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (27 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S24S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT and Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
103.57 MW