Combined Heat and Power (CHP)

9 unique locations (167 components)

St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (14 components)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the combined peak of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
• Ratcliffe Unit 1 coal-fired unit
Active • 2028-29 (T-4), 2025-26 (T-1) ...
2.69 MW
School Road, Aberdeen AB24 1TU (19 components)
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage)
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• bus depot site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.48 MW
Saltend Power Station Saltend Hull HU12 8GA (30 components)
• Unit 1 at Saltend Power Station
• Unit 2 at Saltend Power Station
• Unit 3 at Saltend Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3486.78 MW
Land at Model Farm, Frenchs Road, Walpole St. Andrew, Norfolk, PE14 7JE. (17 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• 2026 kW CHP unit
• N/A
Active • 2025-26 (T-4), 2022-23 (T-4) ...
Indian Queens Power Station St. Dennis St. Austell PL26 8BY (8 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Indian Queens Power Station
• The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 MW.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
262.17 MW
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (15 components)
• Aggregate CMU from multiple sources
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.56 MW
British Gas, Bothwell Road, Uddingston, Glasgow, G71 7TW (42 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
• On-site existing CHP generating unit
Active • 2027-28 (T-4), 2024-25 (T-4) ...
Bath CHP, Midland Road, Bath, BA2 3EW (10 components)
• A gas engine CHP site providing hot water to a local district heating network
• BM Unit T_FFES-1 at Ffestiniog Power Station (Pumped Storage).
• To be confirmed once CMU components are known
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.59 MW
Asda Meanwood, 34 Green Road , Leeds, LS6 4JP (12 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.82 MW
Loading map...
Showing 9 locations