Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

16 unique locations (787 components)

1 Thane Road West, Nottingham, NG2 3AA (128 components)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA (2)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
58.18 MW
Cargill PLC, Trafford Park, M17 1PA (26 components)

Siemens SGT200 Based CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
25.88 MW
Cargill PLC, Trafford Park, Manchester, M17 1PA (75 components)
• Siemens SGT200 based CHP
• Solar T70 Based CHP System
• Solar T70 based CHP system
Active • 2028-29 (T-4), 2027-28 (T-4) ...
82.17 MW
Church Manorway, Erith DA8 1DL (60 components)

gas-fired CHP unit

Active • 2025-26 (T-4), 2024-25 (T-1) ...
27.67 MW
Energy Center, Ashton Street, Liverpool, L69 3GB (70 components)
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Active • 2024-25 (T-4), 2023-24 (T-4) ...
13.81 MW
JDE, Ruscote Avenue, Banbury, Oxfordshire, OX16 2QU (26 components)
• Centrax gas turbine CHP
• Centrax gas turbine which will have bespoke metering in installed to capture the generation output.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Laporte Road, Stallingborough, North East Lincolnshire, DN40 2PR (71 components)
• 2.8MWe back pressure steam turbine
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
Active • 2025-26 (T-1), 2024-25 (T-1) ...
54.81 MW
London Rd, Purfleet RM19 1SD (28 components)

Gas-fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
21.92 MW
Port Causeway Bromborough Merseyside CH62 4TH (34 components)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
16.14 MW
Seal Sands, Middlesborough, TS2 1UB (28 components)

One of four SURF (Aggreko) model CHP units rated at 1375kVA

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
7.23 MW
Seal Sands, Middlesbrough, TS2 1UB (28 components)
• One of four SURF (Aggreko) model CHP units rated at 1375KVA
• One of four SURF (Aggreko) model CHP units rated at 1375kVA
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
7.23 MW
Smurfit Kappa Townsend Hook, Mill Street, Snodland, Kent, ME6 5AX (11 components)
• 5.2MWe CHP gas turbine
• GT2 CHP unit rated at 5.2MW
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Station Road, Wigton, Cumbria CA7 9BG (58 components)
• Back pressure steam turbine
• Gas engine
• Gas turbine
Active • 2025-26 (T-4), 2024-25 (T-4) ...
49.50 MW
Staverton, Trowbridge, Wiltshire, BA14 6PH (34 components)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
19.17 MW
T&L Sugars Limited, Thames Refinery, Factory Road, Silvertown, London, United Kingdom, E16 2EW (47 components)
• No2 Steam turbine - Allen Steam Turbines/NG Model MB510 - 2009 - Nominal power rating 14500kWe
• No5 Gas Turbine - European Gas Turbines SGT200 'Tornado' - S765/01 1997 - Nominal power output 6000kWe
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
66.18 MW
University of Warwick, Coventry, CV4 7AL (63 components)
• One of six CHP units at University of Warwick, Coventry, CV4 7AL
• One of six CHP units at University of Warwick, Coventry, CV4 7AL.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
38.98 MW
Loading map...
Showing 16 locations