Combined Heat and Power (CHP)

9 unique locations (264 components)

Energy Center, Ashton Street, Liverpool, L69 3GB (68 components)
• Longannet coal fired power station - Unit 3
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Active • 2024-25 (T-4), 2023-24 (T-4) ...
18.40 MW
Energy Centre Westfield London, Ariel Way, White City, London, W12 7GF (32 components)
• A gas engine CHP site providing electricity & heat to the associated development
• On-site CHP - existing generating unit Pond Street London OS Grid Reference: TQ 272 854 NW3 2QG
• On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980
Active • 2025-26 (T-4), 2024-25 (T-4) ...
8.59 MW
Engie Great Coates, Grimsby, DN31 2TT (16 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
• N/A
Inactive • 2023-24 (T-1), 2022-23 (T-4) ...
12.43 MW
Liberty Lochaber Smelter, Fort William, Scotland PH33 6TH (53 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Existing CCGT Unit
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Red Roofs Nursery Limited, Dunswell Road, Cottingham, Hull, HU16 4JT (2 components)
• A gas engine CHP site providing hot water to agricultural greenhouses
• N/A
Inactive • 2022-23 (T-4), 2022-23 (T-3)
Rocks Dryer, Rosvear Road, Bugle, St. Austell, PL26 8PJ (14 components)
• Gas CHP
• Gas CHP in St. Austell
• N/A
Active • 2026-27 (T-4), 2024-25 (T-4) ...
13.37 MW
Royal Liverpool University Hospital, Prescott Street, Liverpool L7 8XP (20 components)
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.241 MW and total net power capacity of 5.050 MW.
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.362 MW and total net power capacity of 5.290 MW.
• Industrial Gases production processes. DSR delivered through process interruption
Active • 2025-26 (T-1), 2024-25 (T-1) ...
16.06 MW
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA (4 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• One of six CHP units at University of Warwick, Coventry, CV4 7AL
• Onsite load reduction and back up generation behind the meter on multiple sites
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
University of Warwick, Coventry, CV4 7AL (55 components)
• N/A
• One of six CHP units at University of Warwick, Coventry, CV4 7AL
• One of six CHP units at University of Warwick, Coventry, CV4 7AL.
Active • 2025-26 (T-1), 2023-24 (T-4) ...
20.78 MW
Loading map...
Showing 9 locations