171 unique locations (2421 components) - Page 1 of 7

132 Manchester Road, Carrington, Manchester, M31 4AY (13 components)
• 5 x 9.98MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
• Poole Existing Site CHP
Active • 2027-28 (T-4), 2024-25 (T-4) ...
1763.05 MW
1 Waterfront Avenue, Edinburgh, EH5 1SG (25 components)
• Glenhove Water Pumping Station
• Office site with behind the meter generation
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
0.81 MW
4 Finway Road Hemel Hempstead HP2 7PT (11 components)
• 14.710 MW CHP generation
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
• Onsite load reduction and back up generation behind the meter on multiple sites
Active • 2024-25 (T-4), 2022-23 (T-3) ...
4.76 MW
97 Talbot Road, Stretford, Manchester, Lancashire, M16 0TW (5 components)
• Offsite with behind the meter generation
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
9 Handyside St, Kings Cross, London N1C 4BH (16 components)
• Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.
• Gas fired reciprocating engines.
Active • 2027-28 (T-4), 2024-25 (T-4) ...
7.18 MW
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (29 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• New build transmission connected battery storage site
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.90 MW
Address: Port of Liverpool CHP, Regent Road, Bootle, Liverpool, L20 1ED (21 components)
• A reciprocating gas engine CHP site providing hot water to a local district heating network.
• Gas fired CHP
• New build wind farm at Aberarder consisting of 12 wind turbines.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
29.34 MW
Adjacent to Seal Sand Bulk Storage Facility, Seal Sands, Stockton-on-Tees, Cleveland, TS2 1UB (6 components)
• Solar T70 Based CHP System
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (15 components)
• A New Build 2.5MW Generation Battery Site
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
• Onsite load reduction and back up generation behind the meter on multiple sites
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.31 MW
Ardagh Group - Barnsely Site 1, Burton Road, Monk Bretton South Yorkshire S71 5RP (15 components)
• Gas-fired CHP unit
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
16.24 MW
Asda Chesterfield, Coldstore 5, 1B Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (9 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on flexible electricity consuming processes
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
2.38 MW
Asda, EVESHAM ROAD, BROADWAY, WORCESTERSHIRE, WR12 7PA (9 components)
• Load reduction on site supported by non-exporting standby generation.
• One of three CHP in a horticultural environment
• This DSR component is an industrial and commercial site which can reduce its imported electricity.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
5.91 MW
Asda Sheffield Drakehouse, Stretfield, Derbyshire, S33 9JT (5 components)
• Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 MW as per the 3 highest export peaks
• Hartlepool Power Station CMU 1: [HR1-21] T_HRTL-1
• Load reduction on site supported by non-exporting standby generation.
Active • 2025-26 (T-4), 2022-23 (T-3) ...
Asda Witham Highfields Road, Benfield Way Lakes Road Braintree CM7 3YS (10 components)
• CHP unit
• Load reduction.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.71 MW
Asda Wrexham, Wrexham Industrial Estate Wrexham LL13 9UG (8 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, EPCO1. All Components of EMG-18, EMD-U3 and EMD-T1 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. Gross 3 HH av. peak generation from Unit 5 on separate days = 139.707 MW At these three HH times, aux load on Unit 5 = 2.517 MW Net generation from Unit 5 = 137.190 MW
Active • 2026-27 (T-4), 2022-23 (T-4) ...
1.02 MW
Auchencrosh Converter Station, Ballantrae, Girvan, KA26 OPE (5 components)
• 1.800 MW CHP generation
• The Moyle Interconnector links the electricity grids of Northern Ireland and Scotland through submarine cables running between converter stations at Ballycronan More in Islandmagee, County Antrim and Auchencrosh in Ayrshire. The link has a capacity of 500 MW. The Moyle Interconnector is owned and operated by Moyle Interconnector Limited, which is in turn financed through Moyle Holdings Limited and Moyle Interconnector (Financing) Public Limited Company, all part of the Mutual Energy Limited group of companies.
• The Moyle Interconnector links the electricity grids of Northern Ireland and Scotland through submarine cables running between converter stations at Ballycronan More in Islandmagee, County Antrim and Auchencrosh in Ayrshire. The link has a capacity of 500 MW. The Moyle Interconnector is owned and operated by Moyle Interconnector Limited, which is in turn financed through Moyle Holdings Limited and Moyle Interconnector (Financing) plc, all part of the Mutual Energy Limited group of companies.
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
50.00 MW
Aveley (N) Sandy Lane Aveley South Ockendon Essex RM15 4XP (9 components)
• Gas fired generating unit
• The site comprises of four gas reciprocating engines with an assumed output of 4.6MW. The reciprocating engines are connected to the distribution network.
• gas-fired CHP unit
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
BANKFIELD QUARRY, PIMLICO, CLITHEROE, LANCASHIRE, BB7 4QA (5 components)
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
• Two gas CHP engines in commercial horticultural environment with no auxilliary load
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Bath CHP, Midland Road, Bath, BA2 3EW (10 components)
• A gas engine CHP site providing hot water to a local district heating network
• BM Unit T_FFES-1 at Ffestiniog Power Station (Pumped Storage).
• To be confirmed once CMU components are known
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.59 MW
Beach Esplanade, Aberdeen AB24 5NR (12 components)
• Battery Storage Plant
• CMU consisting of multiple reciprocating engines and alternators
• District heating implementation with one asset 1MW and no auxiliary load
Active • 2028-29 (T-4), 2024-25 (T-4) ...
4.36 MW
Brentfield Road Willesden London NW10 8JP (18 components)
• Taylor's Lane OCGT GT Unit 2 Unit fuelled by Diesel as specified in BS EN590
• Taylor's Lane OCGT GT Unit 3 Unit fuelled by Diesel as specified in BS EN590
• Warrington Existing Site CHP
Active • 2028-29 (T-4), 2024-25 (T-1) ...
388.63 MW
British Gas, Bothwell Road, Uddingston, Glasgow, G71 7TW (42 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
• On-site existing CHP generating unit
Active • 2027-28 (T-4), 2024-25 (T-4) ...
British Gas, Housesteads, Off Stockport Road, Hattersley, SK14 3QU (5 components)
• Office site with behind the meter back-up generation.
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...