Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

24 unique locations (821 components)

1 Thane Road West, Nottingham, NG2 3AA (128 components)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA (2)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
58.18 MW
Church Manorway, Erith DA8 1DL (60 components)

gas-fired CHP unit

Active • 2025-26 (T-4), 2024-25 (T-1) ...
27.67 MW
Energy Center, Ashton Street, Liverpool, L69 3GB (70 components)
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Active • 2024-25 (T-4), 2023-24 (T-4) ...
13.81 MW
JDE, Ruscote Avenue, Banbury, Oxfordshire, OX16 2QU (26 components)
• Centrax gas turbine CHP
• Centrax gas turbine which will have bespoke metering in installed to capture the generation output.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Lancaster University, Bailrigg, Lancaster, LA1 4YW (12 components)

Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
4.97 MW
Laporte Road, Stallingborough, North East Lincolnshire, DN40 2PR (71 components)
• 2.8MWe back pressure steam turbine
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
Active • 2025-26 (T-1), 2024-25 (T-1) ...
54.81 MW
Lockerbie Creamery, Lockerbie, England. DG11 1LW (22 components)

CHP unit

Active • 2025-26 (T-4), 2024-25 (T-4) ...
5.09 MW
London Rd, Purfleet RM19 1SD (28 components)

Gas-fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
21.92 MW
Oakthorpe Dairy, Chequers Way, Palmers Green, London, England, N13 6DA (9 components)

CHP unit - 1 x 2,000kw

Active • 2025-26 (T-4), 2024-25 (T-4) ...
5.14 MW
69.52 MW
Pontefract Rd, Leeds, LS10 1AX (29 components)

CHP unit

Active • 2025-26 (T-4), 2025-26 (T-1) ...
17.16 MW
Port Causeway Bromborough Merseyside CH62 4TH (34 components)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
16.14 MW
Samian Way, Aston, Clinton ,Aylesbury, England, HP22 5EZ (40 components)

CHP unit

Active • 2025-26 (T-4), 2025-26 (T-1) ...
14.42 MW
Solenis, Cleckheaton Road, Low Moor, Bradford, United Kingdom, BD12 0JZ (15 components)
• Gas Turbine CHP unit
• Steam turbine
Active • 2025-26 (T-1), 2024-25 (T-1) ...
10.10 MW
Station Road, Wigton, Cumbria CA7 9BG (58 components)
• Back pressure steam turbine
• Gas engine
• Gas turbine
Active • 2025-26 (T-4), 2024-25 (T-4) ...
49.50 MW
Staverton, Trowbridge, Wiltshire, BA14 6PH (34 components)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
19.17 MW
T&L Sugars Limited, Thames Refinery, Factory Road, Silvertown, London, United Kingdom, E16 2EW (47 components)
• No2 Steam turbine - Allen Steam Turbines/NG Model MB510 - 2009 - Nominal power rating 14500kWe
• No5 Gas Turbine - European Gas Turbines SGT200 'Tornado' - S765/01 1997 - Nominal power output 6000kWe
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
66.18 MW
UK WINDOWS & DOORS GROUP LIMITED, 6400 Severn Drive, Tewkesbury, GL20 8SF. (7 components)

Cummins HSK78 2,000 kW Gas Engine located at UK WINDOWS & DOORS GROUP LIMITED, 6400 Severn Drive, Tewkesbury, GL20 8SF.

Inactive • 2023-24 (T-1), 2022-23 (T-1)
4.89 MW
University of Warwick, Coventry, CV4 7AL (63 components)
• One of six CHP units at University of Warwick, Coventry, CV4 7AL
• One of six CHP units at University of Warwick, Coventry, CV4 7AL.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
38.98 MW
Loading map...
Showing 24 locations