Combined Heat and Power (CHP)

4 unique locations (32 components)

Netherton Farm, Keith AB55 5PE (6 components)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
• Hamms Hall - Existing Site CHP
Active • 2025-26 (T-1), 2024-25 (T-1) ...
55.09 MW
41.27 MW
LAND AND BUILDINGS AT, RIVERFORD FARM WELL BARN AND CADDAFORD, STAVERTON, TOTNES, TQ9 6AF. (Nearest postcode to grid reference: TQ11 0LA). (9 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• Aggregate CMU from multiple sources
• Battery Storage Plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Clachan Power Station, Cairndow, By Inverary, Argyll, PA26 8RG (5 components)
• 1 x hydro turbine & synchronous generator
• A thermal treatment / CHP power generating unit located at Knapton Quarry in North Yorkshire.
• Unit 1 at Saltend Power Station
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 4 locations