Combined Heat and Power (CHP)

7 unique locations (118 components)

Runcton Nursery, Lagness Road, Chichester PO20 1LJ (16 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Load reduction on site supported by non-exporting standby generation.
• Two gas CHP in a horticultural environment with no aux load
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Netherton Farm, Keith AB55 5PE (6 components)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
• Hamms Hall - Existing Site CHP
Active • 2025-26 (T-1), 2024-25 (T-1) ...
55.09 MW
Land at Model Farm, Frenchs Road, Walpole St. Andrew, Norfolk, PE14 7JE. (17 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• 2026 kW CHP unit
• N/A
Active • 2025-26 (T-4), 2022-23 (T-4) ...
Frozen Foods Factory Supply, Whapload Primary substation, Rear of 203 Whapload Road, Lowestoft, Suffolk NR32 1XQ (15 components)
• 20MW of DSR
• 3.350 MW gas engine CHP plant
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
3.02 MW
Clayhill Farm, Greenfield Rd, Westoning, Bedford, MK45 5JD (near MK45 5AD) (2 components)
• 44MW Storage consisting of 11 x 4MW units
• Grain B CCGT Unit 7 CHP element is via supply of heat to Grain LNG regasification facility
Active • 2026-27 (T-4), 2021-22 (T-4)
427.47 MW
Barking Power Station, Chequers Lane, Dagenham, Essex RM9 6PF (33 components)
• 6.000MW of storage located at Westoning
• Gas fired CHP unit
• Three gas turbines operating in open cycle mode. Not a Storage Facility.
Active • 2024-25 (T-4), 2024-25 (T-1) ...
383.96 MW
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (29 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• New build transmission connected battery storage site
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.90 MW
Loading map...
Showing 7 locations