Combined Heat and Power (CHP)

6 unique locations (61 components)

Barrack Road, Exeter, EX2 5DW. (6 components)
• 1.521 MW CHP unit
• Aggregate CMU from multiple sources
Active • 2024-25 (T-4), 2023-24 (T-4) ...
5.25 MW
LAND AND BUILDINGS AT, RIVERFORD FARM WELL BARN AND CADDAFORD, STAVERTON, TOTNES, TQ9 6AF. (Nearest postcode to grid reference: TQ11 0LA). (9 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• Aggregate CMU from multiple sources
• Battery Storage Plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
41.27 MW
Plot 6 Barrow Man Road, Birchington CT7 0AX (19 components)
• CHP engine in a horticultural environment, natural gas, no aux load
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
14.72 MW
Thirsk Factory, Dalton Airfield, Topcliffe, Thirsk, YO7 3HE. (10 components)
• 1.280MW CHP
• Aggregate CMU from Multiple Sources
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
274.49 MW
Western Harbour, Leith Docks, Edinburgh, Lothian,EH6 6PQ (5 components)
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
• Flour & semolina milling business
Active • 2024-25 (T-1), 2021-22 (T-4) ...
0.54 MW
Loading map...
Showing 6 locations