Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

77 unique locations (1483 components) - Page 1 of 4

530 London Road, Croydon CR7 7YE (9 components)

CHP (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
7.35 MW
Aventine Way, Glebe Farm Industrial Estate, Rugby, CV21 1HA (22 components)

A gas CHP supplying a manufacturing facility

Active • 2027-28 (T-4), 2025-26 (T-4) ...
10.94 MW
Barnsley Facilities Services Limited Estates & Facilities Department Gawber Road Barnsley S75 2EP (15 components)
• 1 MW CHP generation
• 1.000 MW CHP generation
Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.91 MW
Blackshaw Rd, London SW17 0QT (10 components)

CHP on a hospital site

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Broadgreen Hospital, Thomas Drive, Liverpool L14 3LB (18 components)
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.000 MW and total net power capacity of 1.949 MW
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.000 MW and total net power capacity of 1.970 MW
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.133 MW.
• ... and 2 more unique descriptions
Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.39 MW
Cardiff Road, Barry, Vale of Glamorgan, CF63 2YL (11 components)

Gas Turbine CHP GT001A

Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.88 MW
Cardiff Road, Barry, Vale of Glamorgsan, CF63 2YL (36 components)
• Gas Turbine CHP GT001A
• Gas Turbine CHP GT001B
• Steam Turbine CHP
Active • 2026-27 (T-4), 2025-26 (T-4) ...
21.21 MW
Church Manorway, Erith DA8 1DL (60 components)

gas-fired CHP unit

Active • 2025-26 (T-4), 2024-25 (T-1) ...
12.58 MW
Cobden Street, Montrose, Angus, DD10 8EA (16 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Cowie Sterling FK7 7BQ (2 components)
• 14.71 MW CHP generation
• 14.710 MW CHP generation
Inactive • 2020-21 (T-1), 2019-20 (T-1)
Cowie Sterling FK7 7BQ (11 components)
• 14.71 MW CHP generation
• 14.710 MW CHP generation
Active • 2027-28 (T-4), 2026-27 (T-4) ...
13.44 MW
Cranbrook CHP2, Honiton Road, Cranbrook, Exeter, EX5 2DX (16 components)
• A gas CHP generator providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.69 MW
Denison Road, Selby, North Yorkshire YO8 8AN (24 components)
• Gas Turbine Cogeneration Unit
• One 8 MWe Gas Turbine Cogeneration Unit (GT2)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
7.51 MW
Denmark Hill, Brixton, London, SE5 9RS (15 components)
• Behind the Meter CHP Unit
• CHP unit
• Gas fired CHP unit
Active • 2025-26 (T-1), 2023-24 (T-4) ...
3.86 MW
DS Smith Paper Limited, Kemsley Paper Mill, Sittingbourne, Kent, ME10 2TD (29 components)
• A gas turbine generating unit, part of a CHP which supplies heat & power to a paper mill
• A gas turbine generating unit, part of a CHP which supplies heat & power to a paper mill
• A steam turbine generating unit, part of a CHP which supplies heat & power to a paper mill
Active • 2025-26 (T-4), 2024-25 (T-4) ...
134.46 MW
Easter Bush Energy Centre, Bush Farm Road, Roslin, Midlothian, EH25 9RG (6 components)

Two CHP, generating for site load which exceeds generating capacity. No aux load.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (69 components)
• Steam Driven Turbo Alternator 8G-2 6.8 MWe
• Steam Driven Turbo Alternator 8G1 6,8 MWe
• Steam Driven Turbo Alternator 8G2 6,8 MWe
• ... and 2 more unique descriptions
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
7.28 MW
Energy Center, Ashton Street, Liverpool, L69 3GB (70 components)
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Energy Centre, St James's University Hospital, Beckett Street, Leeds, LS9 7TF. (9 components)

4.5MWe combined heat and power (CHP) natural gas fired reciprocating engine.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Energy Centre Westfield London, Ariel Way, White City, London, W12 7GF (32 components)

A gas engine CHP site providing electricity & heat to the associated development

Active • 2028-29 (T-4), 2027-28 (T-4) ...
17.17 MW
Engie Great Coates, Grimsby, DN31 2TT (40 components)

Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the …

Active • 2024-25 (T-1), 2023-24 (T-1) ...
5.13 MW
Engie Great Coates, Grimsby, DN31 2TT (8 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
2.05 MW
Engie Great Coates, Grimsby, DN31 2TT (19 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
Active • 2024-25 (T-1), 2023-24 (T-1) ...
2.05 MW
Foresterhill Health Campus, Aberdeen AB25 2AY (8 components)

A gas turbine installed at Aberdeen Royal Infirmary

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 25 locations