Combined Heat and Power (CHP)

66 unique locations (240 components) - Page 1 of 3

Active MW: 17008.53 MW
Inactive MW: 492.25 MW
Wissington Sugar Factory British Sugar plc College Road Wissington King's Lynn PE33 9QG (3 components)

The CMU is a gas fired CCGT CHP (3)

CHP and autogeneration Combined Heat and Power (CHP) BRITISH SUGAR PLC Existing Generating CMU Wissington CHP Wissington CHP +1 more PE33
Inactive • 2020-21 (T-1), 2019-20 (T-1) ...
Warrington Hospital, Lovely Lane, Warrington, Cheshire WA5 1QG (1 component)

1 x Natural Gas Fired CHP unit

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU XGEN29 WA5
Inactive • 2019-20 (T-1)
Warrington Hospital, Lovely Lane, Warrington, CheshireWA5 1QG (1 component) Geocoding Needed

1 x Natural Gas Fired CHP unit

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU Rejected
Inactive • 2019-20 (T-1)
The Royal Marsden NHS Foundation Trust, Downs Road, Sutton, SM2 5PT (4 components)
• Gas Fired - CHP (2)
• CHP
CHP and autogeneration Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU KPEG33 KPEG33 +1 more SM2
Active • 2024-25 (T-1), 2023-24 (T-4) ...
1.88 MW
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (10 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks (2)
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
9.91 MW
The Billingham Synthetic Plant, Haverton Hill Road, Billingham, TS23 1PY (1 component)

A Turbo Altenator located at the Billingham Plant

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CFFGEN TS23
Inactive • 2019-20 (T-1)
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (6 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year. (2)
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
CHP and autogeneration Combined Heat and Power (CHP) SPARK STEAM LIMITED Existing Generating CMU Spark Steam Energy Centre Spark Steam Energy Centre +1 more TS23
Inactive • 2020-21 (T-1), 2019-20 (T-1) ...
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (4 components)

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the … (3)

Active • 2025-26 (T-1), 2019-20 (T-1) ...
1.35 MW
Station Road, Burton Latimer, Kettering, Northants, NN15 5JR (2 components)

CHP (2)

Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU Weetabix NN15
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Stanlow Manufacturing Complex, Ellesmere Port, Cheshire, CH65 4HB (3 components)
• 2 x On-site turbo alternators
• 6 x On-site turbo alternators
• Power Recovery Train
Inactive • 2019-20 (T-1)
Springfields Salwick, Preston, PR4 0XJ (2 components)

2 x CHP (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Southport and Formby District General Hospital Town Lane, Kew Southport Merseyside PR8 6PN (1 component)

1 x Gas reciprocating engines with a total rated gross power capacity of 1.008 MW

Inactive • 2019-20 (T-1)
South Kensington Campus, London, SW7 2AZ (4 components)
• One of two, 4.5MW CHP engines at Imperial Collage London (2)
• One of two, 4.5MW CHP engines located at Imperial College London
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Southampton General Hospital, Tremona Road, Southampton, SO16 6YD (2 components)

2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW. (2)

Combined Heat and Power (CHP) VEOLIA UK LIMITED Existing Generating CMU Southampton General Hospital SO16
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Smurfit Kappa Townsend Hook, Mill Street, Snodland, Kent, ME6 5AX (5 components)
• 5.2MWe CHP gas turbine (2)
• GT2 CHP unit rated at 5.2MW
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Shewalton Road, Irvine, West Sussex, KA11 5AP (4 components)

CHP and autogeneration (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (2 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S19GT2 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
Combined Heat and Power (CHP) Sembcorp Utilities (UK) Limited Existing Generating CMU Sembcorp Wilton GT2 Sembcorp Wilton GT2 TS90
Inactive • 2019-20 (T-1), 2017-18 (T-1)
Sallow Rd, Weldon Ind Est, Corby Northants, NN17 5JX (4 components)

The component corresponds to two gas turbines embedded into a CHP located on an industrial plant. The two turbine export electricity onto the site's private network. (3)

CHP and autogeneration Combined Heat and Power (CHP) Energy Pool UK limited Existing Generating CMU EPO014 EPO014 Rejected NN17
Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Runnings Road, Cheltenham, Gloucestershire, GL51 9NQ (2 components)

A gas engine CHP site providing steam and electricity to an industrial unit (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
RRRL-EfW Facility Norman Road North Belvedere Kent DA17 6JY (3 components)

Energy from Waste Recovery Facility (3)

Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Royal Preston Hospital, Sharoe Green Lane, Fulwood, Preston PR2 9HT (1 component)

CHP plant

Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU Rejected PR2
Inactive • 2019-20 (T-1)
Royal Berkshire NHS Foundation Trust, London Road, Reading, RG1 5AN (2 components)

1 x Gas reciprocating engines with a total rated gross power capacity of 1.992 MW (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Rocks Dryer, Rosevear Road, Bugle - St.Austell PL268PJ (3 components)

One 3.7 MWe gas fired CHP (Centrax KB5) (3)

CHP and autogeneration Combined Heat and Power (CHP) Imerys Minerals Limited Existing Generating CMU Rocks Dryer CHP Rocks Dryer CHP PL26
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Queens Hospital, Belvedere Rd, Burton-on-Trent DE13 0RB (1 component)

CHP plant

Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU Rejected DE13
Inactive • 2019-20 (T-1)
Pyewipe, Grimsby DN31 2SR (2 components)

CHP (2)

CHP and autogeneration Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU Novartis Novartis DN31
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Loading map...
Showing 25 locations