136 unique locations (1873 components) - Page 1 of 6

Warrington Hospital, Lovely Lane, Warrington, CheshireWA5 1QG (2 components)

1 x Natural Gas Fired CHP unit

Inactive • 2019-20 (T-1)
Warrington Hospital, Lovely Lane, Warrington, Cheshire WA5 1QG (2 components)

1 x Natural Gas Fired CHP unit

Inactive • 2019-20 (T-1)
Warrington Hospital, Lovely Lane, Warrington, CheshireWA5 1QG (1 component)

1 x Natural Gas Fired CHP unit

Inactive • 2019-20 (T-1)
Warrington Hospital, Lovely Lane, Warrington, Cheshire WA5 1QG (1 component)

1 x Natural Gas Fired CHP unit

Inactive • 2019-20 (T-1)
University of Warwick, Coventry, CV4 7AL (63 components)
• One of six CHP units at University of Warwick, Coventry, CV4 7AL
• One of six CHP units at University of Warwick, Coventry, CV4 7AL.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
7.82 MW
T&L Sugars Limited, Thames Refinery, Factory Road, Silvertown, London, United Kingdom, E16 2EW (47 components)
• No2 Steam turbine - Allen Steam Turbines/NG Model MB510 - 2009 - Nominal power rating 14500kWe
• No5 Gas Turbine - European Gas Turbines SGT200 'Tornado' - S765/01 1997 - Nominal power output 6000kWe
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
39.48 MW
The Royal Marsden NHS Foundation Trust, Downs Road, Sutton, SM2 5PT (7 components)
• CHP
• Gas Fired - CHP
Active • 2024-25 (T-1), 2023-24 (T-4) ...
The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (19 components)
• Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• Three CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• Three engines of 2.65MW each all CHP engine in a horticultural environment, exporting excess generation to distribution network. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2025-26 (T-4) ...
6.37 MW
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (41 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
9.88 MW
The Billingham Synthetic Plant, Haverton Hill Road, Billingham, TS23 1PY (3 components)

A Turbo Altenator located at the Billingham Plant

Inactive • 2019-20 (T-1)
12.58 MW
Stoneykirk Road, Stranraer, DG9 7BU (23 components)
• CHP unit
• Gas fired CHP unit
Active • 2024-25 (T-1), 2023-24 (T-1) ...
7.16 MW
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (5 components)

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the …

Active • 2025-26 (T-1), 2019-20 (T-1) ...
1.35 MW
Staverton, Trowbridge, Wiltshire, BA14 6PH (34 components)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
15.21 MW
Stanlow Manufacturing Complex, Ellesmere Port, Cheshire, CH65 4HB (9 components)
• 2 x On-site turbo alternators
• 6 x On-site turbo alternators
• Power Recovery Train
Inactive • 2019-20 (T-1)
St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (12 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.72 MW
Southport and Formby District General Hospital Town Lane, Kew Southport Merseyside PR8 6PN (3 components)

1 x Gas reciprocating engines with a total rated gross power capacity of 1.008 MW

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Southport and Formby District General Hospital Town Lane, Kew Southport Merseyside PR8 6PN (1 component)

1 x Gas reciprocating engines with a total rated gross power capacity of 1.008 MW

Inactive • 2019-20 (T-1)
South Kensington Campus, London, SW7 2AZ (6 components)
• One of two, 4.5MW CHP engines at Imperial Collage London
• One of two, 4.5MW CHP engines located at Imperial College London
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Loading map...
Showing 25 locations