Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

70 unique locations (1181 components) - Page 1 of 3

1345 Govan Rd, Glasgow Metropolitan Area G51 4TF (7 components)
• 3 x 1.2MW gas CHP in a hospital environment. (2)
• 3 x 1.2MW gas CHP with 2.2MW excess (only two run at any time)
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
7.95 MW
Arrowe Park Road, Upton, Birkenhead, Wirral CH49 5PE (7 components)

On-site existing CHP generating unit (3)

Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
7.85 MW
Avlon Works, Severn Road, Hallen Bristol, BS10 7ZE, United Kingdom (2 components)
• 2 x Gas reciprocating engines with a total rated gross power capacity of 2.758 MW.
• CHP plant.
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Avlon Works, Severn Road, Hallen Bristol, BS10 7ZE, United Kingdom (5 components)
• 2 x Gas reciprocating engines with a total rated gross power capacity of 2.758 MW.
• CHP plant.
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Blackshaw Rd, London SW17 0QT (10 components)

CHP on a hospital site

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Bo'ness Road Grangemouth Stirlingshire FK3 9XQ (14 components)

CHP Plant connected to Private Wire System (operated by INEOS Infrastructure (Grangemouth) Limited) with Connection to NETS

Active • 2027-28 (T-4), 2026-27 (T-4) ...
259.76 MW
Brigg Road, Scunthorpe, DN16 1BP (6 components)

CHP units

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Cardiff Road, Barry, Vale of Glamorgsan, CF63 2YL (36 components)
• Gas Turbine CHP GT001A
• Gas Turbine CHP GT001B
• Steam Turbine CHP
Active • 2026-27 (T-4), 2025-26 (T-4) ...
21.21 MW
Cats Terminal, Seal Sands Rd, Middlesbrough, Cleveland, TS2 1UB (2 components)

Turbo Expander - for pressure reduction of incoming natural gas

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Cats Terminal, Seal Sands Rd, Middlesbrough, Cleveland, TS2 1UB (6 components)

Turbo Expander - for pressure reduction of incoming natural gas

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
7.04 MW
Clatterbridge Road, Bebington, Birkenhead, Wirral CH63 4JY (7 components)

On-site existing CHP generating unit

Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Cleckheaton Road, Lowmoor, Bradford, BD12 0JZ (13 components)
• Diesel Reciprocating Generator, rated 1MWe nominal
• Diesel Reciprocating Generator, rated 1MWe nominal BABR-2
• Gas turbine generator 6.4MWe CHP BABR-1
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
7.28 MW
Cleckheaton Road, Lowmoore, Bradford, BD12 0JZ (16 components)
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe BABR-1_2
• Steam Turbine
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
7.28 MW
Cobden Street, Montrose, Angus, DD10 8EA (16 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
COFELY Great Coates, Grimsby, DN31 2TT (91 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
5.38 MW
Denmark Hill, Brixton, London, SE5 9RS (15 components)
• Behind the Meter CHP Unit
• CHP unit
• Gas fired CHP unit
Active • 2025-26 (T-1), 2023-24 (T-4) ...
3.86 MW
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (69 components)
• Steam Driven Turbo Alternator 8G-2 6.8 MWe
• Steam Driven Turbo Alternator 8G1 6,8 MWe
• Steam Driven Turbo Alternator 8G2 6,8 MWe
• ... and 2 more unique descriptions
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
50.48 MW
Edgabaston, Birmingham, West Midlands, B15 2TT (40 components)
• Gas Engine
• Gas Turbine Generator
• Gas engine
• ... and 1 more unique description
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
47.35 MW
Energy Centre, Quarryfield Road, Gateshead NE8 3BE (24 components)
• 1 x 2MW CHP generator; natural gas reciprocating engine; primary fuel type = natural gas
• 1x2MW CHP generator: natural gas reciprocating engine. Primary fuel type = natural gas
• CHP in a district heating environment, providing heat & electricity to local area and exporting excess.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Excel Energy Centre Warehouse R Royal Victoria Dock Northside London E16 1BA (38 components)
• 1.2 MW Combined Heat and Power Engine.
• 1.6 MW Combined Heat and Power Engine
• 1.6MW Combined Heat and Power Engine
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.64 MW
Foresterhill Health Campus, Aberdeen AB25 2AY (8 components)

A gas turbine installed at Aberdeen Royal Infirmary

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Frimley Park Hospital, Portsmouth Road, GU16 7UJ (7 components)
• CHP generating in NHS hospital. No aux load.
• CHP generating to cover site load, which exceeds generating capacity. No aux load.
Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (13 components)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
• New CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.56 MW
Gunnels Wood Road, Stevenage, SG1 2NY, United Kingdom (30 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Harmire Road, Barnard Castle, County Durham, DL12 8DT (26 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 25 locations