Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

11 unique locations (157 components)

The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (19 components)
• Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• Three CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• Three engines of 2.65MW each all CHP engine in a horticultural environment, exporting excess generation to distribution network. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2025-26 (T-4) ...
6.37 MW
Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (13 components)
• Gas CHP in horticultural environment providing heat & electricity for crop growth
• One asset 1.13MW CHP engine in a horticultural environment with no auxiliary load.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
2.06 MW
Plot 5, Barrow Man Road, Birchington Kent CT7 0AX (10 components)

One CHP engine in a horticultural environment with no auxilliary load.

Active • 2028-29 (T-4), 2025-26 (T-4) ...
5.95 MW
Minerva Road, Farnworth, Bolton, BL4 0JR (7 components)
• CHP generating for site load, which exceeds generating capacity. No aux load.
• CHP generating in NHS hospital. No aux load.
Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Melrow Nursery, Rydings Lane, Southport PR9 8EB (19 components)

The component consists of gas CHP 3355kW servicing the electricity and heat requirements for Melrow Nursery, one of the horticultural sites which trades at Flavourfresh Salads. The generation unit capacity …

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Marsh Road, Banks, Southport PR9 8DX (24 components)
• Gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The component consists of gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (14 components)

One CHP, generating for site load which exceeds generating capacity. No aux load.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (13 components)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
• New CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.56 MW
Frimley Park Hospital, Portsmouth Road, GU16 7UJ (7 components)
• CHP generating in NHS hospital. No aux load.
• CHP generating to cover site load, which exceeds generating capacity. No aux load.
Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Energy Centre, Quarryfield Road, Gateshead NE8 3BE (24 components)
• 1 x 2MW CHP generator; natural gas reciprocating engine; primary fuel type = natural gas
• 1x2MW CHP generator: natural gas reciprocating engine. Primary fuel type = natural gas
• CHP in a district heating environment, providing heat & electricity to local area and exporting excess.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
1345 Govan Rd, Glasgow Metropolitan Area G51 4TF (7 components)
• 3 x 1.2MW gas CHP in a hospital environment. (2)
• 3 x 1.2MW gas CHP with 2.2MW excess (only two run at any time)
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
7.95 MW
Loading map...
Showing 11 locations