Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Cycle Gas Turbine (CCGT)

144 unique locations (1499 components) - Page 3 of 6

Active MW: 100429.76 MW
Inactive MW: 6087.60 MW
New Hall Farm School Lane Birchwood Warrington WA3 6LH (3 components)

New Gas fulled generation station (3)

Open Cycle Gas Turbine (OCGT) NEW HALL FARM ENERGY LIMITED New Build Generating CMU NHF111 Rejected WA3
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (22 components)
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes (2)
• The CMU is a Open Cycle Gas Turbine (OCGT)
Open Cycle Gas Turbine (OCGT) Combined Cycle Gas Turbine (CCGT) CORBY POWER LIMITED Existing Generating CMU New Build Generating CMU Corby_1 Corby_1 +12 more NN17
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2104.31 MW
Mill Lane, Kirkby in Ashfield, NG17 9LG (1 component)

5 x2MW gas reciprocating engines used for power generation, with associated infrastructure.

Open Cycle Gas Turbine (OCGT) Gas Generation Mansfield Road Limited New Build Generating CMU Gas Generation Bentinck Rejected NG17
Inactive • 2019-20 (T-1)
Millbrook Power Station, Rookery South Pit, Green Lane, Stewartby, Bedfordshire MK43 9LX (3 components)
• A new 299MW Open Cycle Gas Turbine (OCGT) power peaking plant (2)
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Open Cycle Gas Turbine (OCGT) MILLBROOK POWER LIMITED New Build Generating CMU Millbrook Power OCGT Millbrook Power OCGT MK43
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Medway Power Station, Rochester, Medway, ME3 0AG (15 components)

Medway CCGT (3)

Combined Cycle Gas Turbine (CCGT) MEDWAY POWER LIMITED Existing Generating CMU Medway Medway +12 more ME3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4026.04 MW
Meaford Energy Centre, Meaford Business Park, Meaford Road, Meaford, Staffordshire, ST15 8UZ (4 components)

Gas Fired Generating Station (3)

Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Gas) Meaford Energy Limited New Build Generating CMU Meaford Generating Station Meaford Generating Station +2 more ST15
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Marsh Green Industrial Park Marsh Barton Trading Estate Exeter Devon EX2 8NY (6 components)

Existing OCGT. (3)

Reciprocating engines Open Cycle Gas Turbine (OCGT) WHITETOWER ENERGY LIMITED Existing Generating CMU Exeter Power Exeter Power +4 more EX2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
128.10 MW
Marsh Green Industrial Park Marsh Barton Trading Estate Exeter Devon EX2 8NY (2 components)

Existing OCGT. (2)

Open Cycle Gas Turbine (OCGT) WHITETOWER ENERGY LIMITED Existing Generating CMU Exeter Power Exeter Power EX2
Inactive • 2023-24 (T-1), 2022-23 (T-1)
41.91 MW
Marchwood Power, Marchwood Industrial Park, Oceanic Way, Marchwood, Southampton, SO40 4BD (10 components)

Marchwood CCGT (3)

Combined Cycle Gas Turbine (CCGT) SSE ENERGY SUPPLY LIMITED Existing Generating CMU Marchwood Marchwood +8 more SO40
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2519.70 MW
Lynchford Lane, Farnborough, GU14 6LW (4 components)

10 gas reciprocating engines used for power generation, with associated infrastructure. (3)

Open Cycle Gas Turbine (OCGT) Gas Generation Buckland Road Limited New Build Generating CMU Gas Generation Farnborough Gas Generation Farnborough +2 more Not Prequalified GU14
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Livesey Branch Rd. Feniscowles. Blackburn. Lancashire. BB2 5HX (2 components)

Small Combined Cycle Gas Turbine plant Registered capacity 75MVA or 60MW at 0.8PF. (2)

Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED Existing Generating CMU Blackburn Mill Blackburn Mill BB2
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Livesey Branch Rd, Feniscowles, Blackburn, Lancashire, BB2 5HX (10 components)
• Small Combined Cycle Gas Turbine plant with registered capacity 75MVA or 60MW at 0.8PF. (2)
• Small Combined Cycle Gas Turbine plant with contracted connection capacity 75MVA or 60MW at 0.8PF
Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED Existing Generating CMU Blackburn Mill Blackburn Mill +3 more BB2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
221.95 MW
Little Barford Power Station Little Barford St Neots PE19 6YT (20 components)
• Little Barford 1 CCGT MSID: 4052 (2)
• Little Barford 1 OCGT . fuel type is distillate MSID: 4052
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2060.91 MW
Land West of Yelland Quay, West Yelland, Yelland, Barnstaple, EX31 3HB (1 component)

10 x 2MW gas reciprocating engines used for power generation, with associated infrastructure.

Open Cycle Gas Turbine (OCGT) Gas Generation Castlebridge Limited New Build Generating CMU Gas Generation Yelland Conditional EX31
Inactive • 2022-23 (T-4)
Land off Well Street, Paisley, PA1 2QH (4 components)

4 gas reciprocating engines used for power generation, with associated infrastructure. (3)

Open Cycle Gas Turbine (OCGT) GAS GENERATION PROPERTY LIMITED New Build Generating CMU Gas Generation Paisley 1 Gas Generation Property +2 more PA1
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land off Bicester Road Bicester Oxfordshire OX26 6EP (1 component)

Gas fuelled generation plant

Open Cycle Gas Turbine (OCGT) SOLARDEV 3 LTD New Build Generating CMU Conditional OX26
Inactive • 2022-23 (T-4)
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (6 components)
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a gas power facility on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
817.08 MW
land at Hoon Hay Farm, Marston Lane, Hatton, Derbyshire, DE65 5EA (1 component)

gas powered generator to be installed on designated land within a manufacturing compound at the Hoon Hay Farm.

Active • 2024-25 (T-4)
land at Hoon Hay Farm Marston Lane Hatton Derby DE65 5EA (1 component)

Gas fuelled generation plant

Open Cycle Gas Turbine (OCGT) HATTON FARM ENERGY LIMITED New Build Generating CMU Conditional DE65
Inactive • 2022-23 (T-4)
LAND AT FENTON LANE LITTLE FENTON SHERBURN IN ELMET LS25 6HA (3 components)

NEW BUILD GAS GENERATION STATION (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land adjacent to Brynfyrd, Botley Road, Romsey, SO52 9DP (1 component)

10 x 2MW gas powered generator units to be installed on designated land within a manufacturing compound at the Botley Farm.

Open Cycle Gas Turbine (OCGT) BOTLEY ENERGY LIMITED New Build Generating CMU BOT111 SO52
Inactive • 2021-22 (T-1)
Land adjacent to Brynfyrd Botley Road Romsey SO52 9DP (3 components)

Gas fuelled generation plant (2)

Open Cycle Gas Turbine (OCGT) BOTLEY ENERGY LIMITED New Build Generating CMU BOT111 SO52
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Knottingley Power Limited Knottingley CCGT Power Station Common Lane Knottingley West Yorkshire WF11 8DA (4 components)
• Knottingley Unit 1 is a combined cycle gas turbine generating unit (2)
• Knottingly Unit 2 is a combined cycle gas turbine generating unit
Combined Cycle Gas Turbine (CCGT) Knottingley Power Limited New Build Generating CMU Knottingley Unit 1 Knottingley Unit 1 +2 more WF11
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Knapton Generating Station, East Knapton, Malton, North Yorkshire, YO17 8JF (3 components)

Generating Station, the power generation facilities consist of RLM 6000 EGT generation package with a LM6000 gas turbine (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (Next to Damhead Creek Power Station CMU SP18DC) (1 component)

New build Combined Cycle Gas Turbine plant

Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED New Build Generating CMU Damhead Creek 2 CCGT Conditional ME3
Inactive • 2022-23 (T-4)
Loading map...
Showing 25 locations