Combined Cycle Gas Turbine (CCGT)

9 unique locations (212 components)

Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU (37 components)
• 2mW 2.3MWH Battery Energy Storage System
• Didcot B5 - CCGT MSID: 4055
• Didcot B6 - CCGT MSID: 4055
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3355.13 MW
Energy Hub, Corner of Rodney Road and Heygate Street, London, SE17 1FJ (18 components)
• A site with two gas engine CHPs providing hot water to a local district heating network
• A site with two gas engine CHPs, providing hot water to a local district heating network
• CMU INO200 represents demand assets on the Inovyn ChlorVinyls Ltd site in Runcorn, Cheshire. The asset uses electricity for Chemical manufacture. Site load can easily be altered to suit demand or reduction.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
3.51 MW
Excel Energy Centre Warehouse R Royal Victoria Dock Northside London E16 1BA (47 components)
• 1.2 MW Combined Heat and Power Engine.
• 1.6 MW Combined Heat and Power Engine
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
13.26 MW
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (16 components)
• 10 x 1mw gas generator units to be installed on designated land at Burghfield Road Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• Existing CCGT
• One CHP, generating for site load which exceeds generating capacity. No aux load.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Park Road Worthing, West Sussex, BN11 2AW (1 component)

Connah's Quay PS Unit 1 CCGT

Inactive • 2023-24 (T-4)
Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (18 components)
• Combined Cycle Gas Turbine
• One asset 1.13MW CHP engine in a horticultural environment with no auxiliary load.
• One asset 2.0MW CHP engine in a horticultural environment with no auxiliary load.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
4.87 MW
Seabank Power Limited Severn Road, Hallen, Bristol BS10 7SP (6 components)

Single Shaft CCGT (Module 2)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
385.46 MW
Tyseley, Hay Hall Road, Tyseley, B11 2AU (2 components)
• Connah's Quay PS Unit 2 CCGT
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2022-23 (T-4), 2020-21 (T-4)
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (67 components)
• A gas engine CHP site providing electricity & heat to the associated development
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
• Load reduction on site supported by non-exporting standby generation.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 9 locations