Combined Cycle Gas Turbine (CCGT)

4 unique locations (35 components)

1 Ratty's Lane, Hoddesdon, Hertfordshire, EN11 0RF (5 components)
• Combined Cycle Gas Turbine
• Combined Cycle Gas Turbine plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
650.29 MW
Basin Road South, Portslade, East Sussex, BN41 1WF (7 components)
• Combined Cycle Gas Turbine plant
• Existing Combined Cycle Gas Turbine plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
381.99 MW
Kingsnorth, Hoo, Rochester, Kent, ME3 9TX (11 components)
• A new combined cycle gas turbine (unit 5) at Damhead Creek 2 power plant
• Combined Cycle Gas Turbine plant
• a new combined cycle gas turbine (unit 5) at Damhead Creek 2 power plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
738.51 MW
Livesey Branch Rd, Feniscowles, Blackburn, Lancashire, BB2 5HX (12 components)
• Small Combined Cycle Gas Turbine plant with contracted connection capacity 75MVA or 60MW at 0.8PF
• Small Combined Cycle Gas Turbine plant with registered capacity 75MVA or 60MW at 0.8PF.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
56.10 MW
Loading map...
Showing 4 locations