Combined Cycle Gas Turbine (CCGT)

5 unique locations (10 components)

ROBIN CLOSE OLLERTON NEWARK NOTTINGHAMSHIRE NG22 (2 components)
• Barnsley CMU Outlined in associated Construction Plan Bootle and Barnsley Output metered net of Station Load - no separate metered auxiliary exists
• Existing CCGT
Active • 2028-29 (T-4), 2018-19 (T-4)
42.88 MW
HATFIELD PLACE PETERLEE SR8 (2 components)
• Existing CCGT to be refurbished
• Meter not installed or allocated at this point. Installation of two Combined Chilling/Heating and Power plants (CCHP) at Citi's Riverdale Data Centre in Lewisham, each with a connection capacity of 1.4MW, totalling 2.8MW overall. The postcode for the location of the CMU component is SE13 7EY.
Active • 2028-29 (T-4), 2018-19 (T-4)
46.66 MW
FALCON DRIVE NEWTON MEARNS GLASGOW G77 (2 components)
• Bootle CMU Outlined in asscociated Construction Plan Bootle and Barnsley Output metered net of Station Load - no separate metered auxiliary exists
• Existing CCGT to be refurbished
Active • 2028-29 (T-4), 2018-19 (T-4)
47.09 MW
Chestnut Park Wotton-Under-Edge Gloucestershire GL12 (2 components)
• Existing CCGT
• Meter not installed or allocated at this point. Installation of a 1.4MW Combined Chilling/Heating and Power plant (CCHP) at St. Bartholemew's Hospital, London. The post code for the location of the CMU component is EC1A 7BE
Active • 2028-29 (T-4), 2018-19 (T-4)
42.88 MW
Brooklawn Drive Manchester Lancashire M20 (2 components)
• As per the Single Line Diagram supplied with this application the proposed CM Settlement meter will be the export meter (MPAN 1023485782546) on the DNO connection. As such auxiliary load will already have been deducted from generation output. The stated connection capacity assumes a Power Factor of 1.0 The CMU is located at Bury St Edmunds Sugar Factory PO Box 15 Hollow Road Bury St Edmunds IP32 7BB
• Existing CCGT to be refurbished
Active • 2028-29 (T-4), 2018-19 (T-4)
52.90 MW
Loading map...
Showing 5 locations