Combined Cycle Gas Turbine (CCGT)

19 unique locations (141 components)

Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP (8 components)
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
• Unit 2 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
• Unit 2 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire. Metering of output is Net of auxillary load.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
West Marsh Road, Spalding, Lincolnshire, PE11 3BB (6 components)

A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. …

Active • 2026-27 (T-4), 2025-26 (T-4) ...
867.73 MW
Thorpe Marsh Power Station, nr Barnby Dun, Doncaster DN3 1ET (4 components)
• CCGT Unit
• CCGT Unit 1 (connected as G1)
• New combined cycle gas turbine power station comprising two units of the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed nr Barnby Dun
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Severn Power Station West Nash Road Newport NP18 2BZ (9 components)

Existing CCGT unit

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (7 components)
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Livesey Branch Rd. Feniscowles. Blackburn. Lancashire. BB2 5HX (2 components)

Small Combined Cycle Gas Turbine plant Registered capacity 75MVA or 60MW at 0.8PF.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (9 components)
• Combined Cycle Gas Turbine plant
• New build Combined Cycle Gas Turbine plant
• New build Open Cycle Gas Turbine plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
King's Lynn B Power Station, Willow Road, Willows Business Park, King?s Lynn, PE34 3RD, Norfolk (9 components)
• New build Combined Cycle Gas Turbine unit G1 at King's Lynn B.
• New build Combined Cycle Gas Turbine unit G2 at King's Lynn B.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ. (5 components)

EP Humber Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ (5 components)

EP Humber Power Station Phase 2 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
EDF Energy (Thermal Generation) Limited, West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (12 components)
• West Burton B Power Station CMU 1 WB1-19= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-18= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-20= 100% T_WBURB-3
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Drakelow Power Station, Burton on Trent, DE15 9TZ (5 components)

The unit is a four on two air cooled CCGT utilizing Siemens Industrial Trent DLE aero-derivitive gas turbines. The plant will be located at Drakelow, South Derbyshire.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Centrica Barry Power Station, Sully Moors Rd, Sully, CF64 5RP. (10 components)

Centrica Barry Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Basin Road South. Portslade. East Sussex. BN41 1WF (5 components)

Combined Cycle Gas Turbine plant

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Baglan Bay Power Station Baglan Energy Park Port Talbot SA12 7GE (22 components)
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
• Existing CCGT Baglan Unit 1
• Existing CHP/OCGT module
Active • 2024-25 (T-4), 2023-24 (T-4) ...
ASHLAND FARM BECK LANE SKEGBY SUTTON IN ASHFIELD NG19 6PG (3 components)

NEW BUILD GAS FUELLED GENERATING STATION (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
28.38 MW
1 Ratty's Lane, Hoddesdon. Hertsfordshire. EN11 0RF (2 components)

Combined Cycle Gas Turbine (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
1287.00 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
Active • 2027-28 (T-4), 2025-26 (T-4) ...
6769.88 MW
Loading map...
Showing 19 locations