Combined Cycle Gas Turbine (CCGT)

3 unique locations (41 components)

Thorpe Marsh Power Station, nr Barnby Dun, Doncaster DN3 1ET (4 components)
• CCGT Unit
• CCGT Unit 1 (connected as G1)
• CCGT Unit 2 (connected as G2)
• ... and 1 more unique description
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
4320.00 MW
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (29 components)
• West Burton B Power Station CMU 1 WB1-16= 100% T_WBURB-1
• West Burton B Power Station CMU 1 WB1-17= 100% T_WBURB-1
• West Burton B Power Station CMU 1 WB1-21= 100% T_WBURB-1
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7334.74 MW
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP (8 components)
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire. Metering of output is Net of auxillary load.
• Unit 2 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
• ... and 1 more unique description
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
4445.10 MW
Loading map...
Showing 3 locations