Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Coal/biomass

7 unique locations (65 components)

Cornwall Energy Recovery Centre St Dennis Cornwall PL26 8DY (9 components)
• New Build Energy from Waste Plant (2)
• Existing Energy from Waste Plant
Inactive • 2018-19 (T-1), 2017-18 (T-1) ...
17.57 MW
Kincardine on Forth. Clackmannanshire. FK10 4AA. Scotland (16 components)
• Longannet coal fired power station - Unit 1
• Longannet coal fired power station - Unit 2
• Longannet coal fired power station - Unit 3
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Lister Road Dudley West Midlands DY2 8JT (3 components)
• 2 stream Municipal waste incinerator: Total installed capacity 7.3MW, DNC 6.2MW (2)
• 2 stream Municipal waste incinerator: Total installed capacity 7.4MW, DNC 6.3MW. We have added covering letters on the following, change …
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Severnside Energy Recovery Centre Severn Road Hallen, Bristol South Gloucestershire BS10 7SP (8 components)
• New Build Energy from Waste Plant (2)
• Existing Energy from Waste Plant
Inactive • 2018-19 (T-1), 2017-18 (T-1) ...
West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (20 components)
• West Burton A Power Station CMU 1 WA1-17 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
• West Burton A Power Station CMU 2 WA2-17 = 100% (T_WBUPS-2) + 25% (E_WBUPS-STX)
• West Burton A Power Station CMU 3 WA3-17 = 100% (T_WBUPS-3) + 25% (E_WBUPS-STX)
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Wolverhampton EfW Crown Street West Midlands WV1 1QB (3 components)
• 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 8.35MW (2)
• 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 7.3MW. We have added covering letters on the following, change …
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Loading map...
Showing 7 locations