Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Coal

12 unique locations (418 components)

Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (59 components)
• Aberthaw 7 OCGT fuel type distillate
• Aberthaw 7 OCGT fuel type gasoil
• Aberthaw 8 OCGT fuel is distillate
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Coatbridge, ML5 4UG, Scotland (3 components)

Energy from Waste facility

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
EcoPark, Advent Way, Edmonton, London N18 3AG (13 components)

Inclined grate residual Waste-to-Energy facility comprising 5-boilers and 4-turbines.

Active • 2025-26 (T-1), 2024-25 (T-4) ...
17.61 MW
EDF Energy (Thermal Generation) Limited, Cottam Power Station, Outgang Lane, Cottam, Retford, DN22 0NP (27 components)
• Cottam Power Station CMU 3 CT3C18 = 100% (T_COTPS-3) + 25% (T_COTPS-S)
• Cottam Power Station Combined CMU CTC-19 = 100% (T_COTPS-1) + 100% (T_COTPS-2)+ 100% (T_COTPS-3) +100% (T_COTPS-4) +100% (T_COTPS-S) Component T_COTPS-3 …
• Cottam Power Station Combined CMU CTC-19 = 100% (T_COTPS-1) + 100% (T_COTPS-2)+ 100% (T_COTPS-3) +100% (T_COTPS-4) +100% (T_COTPS-S) Component T_COTPS-4 …
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (83 components)
• West Burton A Power Station CMU 3 WA3-19 = 100% (T_WBUPS-3) + 25% (E_WBUPS-STX)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) …
• West Burton A Power Station Gas Turbine CMU 1 WG1-18 = 100% T_WBUGT-1
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Newlands Road Wentloog Cardiff CF3 2EF (2 components)

Energy From Waste facility

Inactive • 2023-24 (T-4), 2021-22 (T-4)
North Road, Eastham, CH65 1AJ (4 components)

Energy from waste Facility

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Stoke EfW plant Campbell Road Sideway Stoke on Trent St4 4DX (8 components)
• 2 stream municipal waste incinerator
• 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being …
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 12 locations