Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP

15 unique locations (180 components)

British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (21 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (2)
• existing CHP on site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.04 MW
28.35 MW
46.25 MW
Maesgwyn Farm, Chirk, Wrexham, LL14 5NT (14 components)

On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383 (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
122.26 MW
MGH Property Services Limited, Laurels Farm, Hatherton, Nantwich, CW5 7PW (11 components)

Nantwich Existing Site CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.44 MW
Pond Street London NW3 2QG (9 components)

On-site CHP - existing generating unit Pond Street London OS Grid Reference: TQ 272 854 NW3 2QG (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.13 MW
4.71 MW
Samworth Brothers, 81-83 Tavistock Road, Callington, Cornwall, PL17 7TA (11 components)

Callington - Existing Site CHP unit (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.54 MW
Solvay, Trinity St, Oldbury, B69 4LW (6 components)

Existing Generation on existing site - CHP (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.54 MW
14.79 MW
Staithes Road, Preston, Hull, HU12 8TB (23 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.65 MW
The Ridgeway Enfield, Middlesex EN2 8JL (9 components)

On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980 (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.03 MW
Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP (13 components)

Warrington Existing Site CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.27 MW
WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (6 components)

Existing Generation on existing site - CHP (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
18.15 MW
Loading map...
Showing 15 locations