Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP

14 unique locations (209 components)

15.32 MW
Cobden Street, Montrose, Angus, DD10 8EA (9 components)

On-site existing CHP generating unit (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Denison Road, Selby, North Yorkshire YO8 8AN (18 components)

One 8 MWe Gas Turbine Cogeneration Unit (GT2) (5)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
7.51 MW
Denison Road, Selby, North Yorkshire YO8 8AN (15 components)

One 8 MWe Gas Turbine Cogeneration Unit (GT2) (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
7.51 MW
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (35 components)
• Steam Driven Turbo Alternator 8G-2 6.8 MWe
• Steam Driven Turbo Alternator 8G1 6,8 MWe
• Steam Driven Turbo Alternator 8G4 7MWe (derated to 4 MWe for mechanical reasons)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Gunnels Wood Road, Stevenage, SG1 2NY, United Kingdom (18 components)

On-site existing CHP generating unit (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Harmire Road, Barnard Castle, County Durham, DL12 8D (8 components)

On-site existing CHP generating unit (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Harmire Road, Barnard Castle, County Durham, DL12 8DT (14 components)

On-site existing CHP generating unit (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
North Avenue, Marston Green, Birmingham, B40 1NT (12 components)
• CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
• Gas Generation units at 1013kWe
• Proposed CHP Unit 850kWe to be installed in Hall 6-8 at NEC site
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Park Road, Ware. Hertfordshire, SG12 0DP (20 components)

On-site existing CHP generating unit (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Priory Street, Ware, Hertfordshire, SG12 0DJ (9 components)

On-site existing CHP generating unit (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Saddlebow Industrial Estate, Poplar Avenue, King's Lynn PE34 3AL. (13 components)

Power Station for Paper plant made up of 1x35MW Gas engine plus 1x12MW steam turbine (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
41.29 MW
Southdownview Way, Worthing, West Sussex, BN14 8QH (8 components)

CHP and autogeneration (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 14 locations