Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP

14 unique locations (360 components)

1 Thane Road West, Nottingham, NG2 3AA (60 components)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA (2)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2024-25 (T-1), 2023-24 (T-1) ...
17.30 MW
Church Manorway, Erith DA8 1DL (33 components)

gas-fired CHP unit (3)

Active • 2024-25 (T-1), 2023-24 (T-1) ...
Energy Center, Ashton Street, Liverpool, L69 3GB (39 components)
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB (2)
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Active • 2024-25 (T-4), 2023-24 (T-4) ...
JDE, Ruscote Avenue, Banbury, Oxfordshire, OX16 2QU (16 components)
• Centrax gas turbine CHP (2)
• Centrax gas turbine which will have bespoke metering in installed to capture the generation output.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Laporte Road, Stallingborough, North East Lincolnshire, DN40 2PR (33 components)
• 2.8MWe back pressure steam turbine (2)
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
Active • 2024-25 (T-1), 2023-24 (T-1) ...
London Rd, Purfleet RM19 1SD (16 components)

Gas-fired CHP unit (3)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.31 MW
Port Causeway Bromborough Merseyside CH62 4TH (16 components)

Turbomach M50 Natural Gas fired CHP unit (3)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
4.03 MW
Seal Sands, Middlesborough, TS2 1UB (14 components)

One of four SURF (Aggreko) model CHP units rated at 1375kVA (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Seal Sands, Middlesbrough, TS2 1UB (14 components)
• One of four SURF (Aggreko) model CHP units rated at 1375kVA (2)
• One of four SURF (Aggreko) model CHP units rated at 1375KVA
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Smurfit Kappa Townsend Hook, Mill Street, Snodland, Kent, ME6 5AX (5 components)
• 5.2MWe CHP gas turbine (2)
• GT2 CHP unit rated at 5.2MW
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Station Road, Wigton, Cumbria CA7 9BG (29 components)
• Gas engine (2)
• Gas turbine
Active • 2024-25 (T-4), 2024-25 (T-1) ...
11.17 MW
Staverton, Trowbridge, Wiltshire, BA14 6PH (17 components)

Turbomach M50 Natural Gas fired CHP unit (3)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.60 MW
T&L Sugars Limited, Thames Refinery, Factory Road, Silvertown, London, United Kingdom, E16 2EW (26 components)
• No2 Steam turbine - Allen Steam Turbines/NG Model MB510 - 2009 - Nominal power rating 14500kWe (2)
• No5 Gas Turbine - European Gas Turbines SGT200 'Tornado' - S765/01 1997 - Nominal power output 6000kWe
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
13.16 MW
University of Warwick, Coventry, CV4 7AL (42 components)
• One of six CHP units at University of Warwick, Coventry, CV4 7AL (2)
• One of six CHP units at University of Warwick, Coventry, CV4 7AL.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 14 locations