Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

38 unique locations (313 components) - Page 1 of 2

Active MW: 35388.22 MW
Inactive MW: 1729.46 MW
2 Samworth Way, Melton Mowbray LE13 1GA (7 components)

Existing Generation on existing site - CHP

Active • 2029-30 (T-4), 2028-29 (T-4) ...
9.34 MW
Aspatria Creamery/Station Rd, Wigton CA7 2AR (8 components)

Existing Generation on existing site - CHP

Active • 2029-30 (T-4), 2028-29 (T-4) ...
7.71 MW
Bar Ln, Boroughbridge, Roecliffe, York YO51 9NN (6 components)

on site generating CMU

Active • 2029-30 (T-4), 2027-28 (T-4) ...
8.97 MW
Cashmere Works, Birksland Street, Bradford, West Yorkshire, BD3 9SX (5 components)

On-Site Generating CMU

Active • 2029-30 (T-4), 2028-29 (T-4) ...
6.75 MW
Chryston, Moodiesburn, Glasgow G69 0JE (5 components)

On-site Generating CMU.

Active • 2029-30 (T-4), 2028-29 (T-4) ...
8.19 MW
Clough Green, Cawthorne, Barnsley, S75 4AD (5 components)

On-site Generating CMU.

Active • 2029-30 (T-4), 2026-27 (T-1) ...
3.76 MW
Donaldsons Nursery, Vinnetrow Road, Runcton, Chichester PO20 1QD (3 components)

Existing Generating CHP

Active • 2029-30 (T-4), 2026-27 (T-1) ...
4.18 MW
Hams Hall Sustainable Energy LTD, Edison Road, Hams Hall Distribution Park, Coleshill, B46 1AL (12 components)

Hamms Hall - Existing Site CHP

Active • 2029-30 (T-4), 2028-29 (T-4) ...
7.30 MW
Hugden Way, Malton YO17 9HG (6 components)
• On-site Generating Unit.
• on site generating cmu
Active • 2029-30 (T-4), 2028-29 (T-4) ...
13.30 MW
Innospec Manufacturing Park, Oil Sites Road Ellesmere Port, Cheshire CH65 4EY (4 components)

On-site Generating CMU.

Active • 2029-30 (T-4), 2028-29 (T-4) ...
11.20 MW
Lake Rd, Trafford Park, Stretford, Manchester M17 1TU, United Kingdom (6 components)

On-Site Generating CMU

Active • 2029-30 (T-4), 2028-29 (T-4) ...
10.42 MW
Lindum Mill, Ashby Road, Shepshed, Leicestershire, LE12 9BS (5 components)

On-Site Generating CMU

Active • 2029-30 (T-4), 2028-29 (T-4) ...
5.46 MW
Maesgwyn Farm, Chirk, Wrexham, LL14 5NT (16 components)

On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU GridBeyond GBD009 LL14
Active • 2029-30 (T-4), 2028-29 (T-4) ...
168.87 MW
13.20 MW
MGH Property Services Limited, Laurels Farm, Hatherton, Nantwich, CW5 7PW (12 components)

Nantwich Existing Site CHP

Active • 2029-30 (T-4), 2028-29 (T-4) ...
6.05 MW
Morrisons Farmers Boy, Cemetery Road, Greenside Park, Bradford BD8 9RU (4 components)

On-Site Generating CMU

Active • 2029-30 (T-4), 2026-27 (T-1) ...
5.32 MW
Muller Milk and Ingredients Market Way, North Petherton, Bridgwater, TA6 6DF (6 components)

On-Site Generating CMU

Active • 2029-30 (T-4), 2028-29 (T-4) ...
12.65 MW
Muller Milk & Ingredients Ltd, Stonebridge Cross, Hampton Lovett, Droitwich, WR9 0NX (6 components)

On-Site Generating CMU

Active • 2029-30 (T-4), 2028-29 (T-4) ...
20.89 MW
Muller UK Limited, Tern Valley Business Park, Market Drayton, Shropshire, TF9 3SQ (6 components)

On-Site Generating CMU

Active • 2029-30 (T-4), 2028-29 (T-4) ...
20.48 MW
Nufarm Wyke Lane, Wyke, Bradford, West Yorkshire, BD12 9EJ (5 components)

On-Site Generating CMU

Active • 2029-30 (T-4), 2028-29 (T-4) ...
18.66 MW
Pembroke Rd, Merlin's Bridge, Haverfordwest SA61 1JN (8 components)

Existing Generation on existing site - CHP

Active • 2029-30 (T-4), 2028-29 (T-4) ...
7.71 MW
Pond Street London NW3 2QG (12 components)
Active • 2029-30 (T-4), 2027-28 (T-4) ...
15.41 MW
Pond Street, London, NW3 2QG (12 components)

On-site CHP - existing generating unit Pond Street London OS Grid Reference: TQ 272 854 NW3 2QG

Active • 2029-30 (T-4), 2027-28 (T-4) ...
15.41 MW
Poole Sustainable Energy LTD, Sterte Ave, Poole, Dorset, BH15 2AS (12 components)

Poole Existing Site CHP

Active • 2029-30 (T-4), 2028-29 (T-4) ...
8.34 MW
Repton Rd (Adjacent to Plastic Omnium Site), Measham DE12 7DT (4 components)

On-Site Generating CMU.

Active • 2029-30 (T-4), 2026-27 (T-1) ...
5.67 MW
Loading map...
Showing 25 locations