Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

85 unique locations (962 components) - Page 1 of 4

Active MW: 35388.22 MW
Inactive MW: 1729.46 MW
Woodhouse Energy Centre, A. Pearson and Sons? Nursery, Alderley Edge, SK9 7UW (9 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used. (2)
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.23 MW
Wissington Sugar Factory, British Sugar plc, College Road, Wissington, King's Lynn, PE33 9QG (16 components)

The CMU is a gas fired CCGT CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
125.98 MW
Winnington CHP, Winnington Lane, Winnington, Northwich, Cheshire, CW8 4GX (28 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (2)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
119.61 MW
Westexe, Tiverton, Devon, EX16 5LL (6 components)

2026 kW CHP unit (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.65 MW
WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (6 components)

Existing Generation on existing site - CHP (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
36.30 MW
1.79 MW
Unit 3016 Hereford Street Bolton BL1 8HU (6 components)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.79 MW
Unit 2898, Tuscany Park, Wakefield, WF6 2TZ (6 components)

EnerG 1000 CHP (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.82 MW
Unit 2898 Tuscany Park Wakefield WF6 2TZ (6 components)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.82 MW
Treviscoe Dryer, Little Treviscoe, St. Austell, PL26 7QN (9 components)
• Gas fired CHP unit (2)
• Gas CHP in St. Austell
Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU KPEG55 PL26
Active • 2026-27 (T-4), 2025-26 (T-4) ...
6.12 MW
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (11 components)

Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations (3)

Active • 2029-30 (T-4), 2028-29 (T-4) ...
8.20 MW
Thirsk Factory, Dalton Airfield, Topcliffe, Thirsk, YO7 3HE. (5 components)

1.280MW CHP (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
2.34 MW
The Ridgeway, Enfield, Middlesex, EN2 8JL (10 components)

On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980 (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.03 MW
The Ridgeway Enfield, Middlesex EN2 8JL (12 components)
Active • 2029-30 (T-4), 2027-28 (T-4) ...
3.88 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (21 components)

The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.39 MW
Stainland Boardmill, Holywell Green, Halifax, HX4 9PY (3 components)

Gas Fired CHP (3)

Combined Heat and Power (CHP) E.ON UK PLC New Build Generating CMU SON_CHP SON_CHP HX4
Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.78 MW
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (11 components)

Existing Generation on existing site - CHP (3)

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected WV15
Active • 2029-30 (T-4), 2027-28 (T-4) ...
24.61 MW
Solvay, Trinity St, Oldbury, B69 4LW (6 components)

Existing Generation on existing site - CHP (3)

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected B69
Active • 2027-28 (T-4), 2026-27 (T-4) ...
6.46 MW
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham, B7 5RE (13 components)

1 x 3.5MW natural gas fired turbine + 1 x 4.8MW natural gas fired turbine (2)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.58 MW
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham B7 5RE (11 components)

8.300MW Gas Turbine installation (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.58 MW
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS, United Kingdom (12 components)

CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.40 MW
School Road, Aberdeen AB24 1TU (14 components)
• District heating implementation with 2 x 1.063MW CHP exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations. Historic Average Output is 1,916.424kW.
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.96 MW
Loading map...
Showing 25 locations