Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

78 unique locations (696 components) - Page 1 of 4

Active MW: 35388.22 MW
Inactive MW: 1729.46 MW
Young's House, Wickham Road, Grimsby DN32 8HW (4 components) Geocoding Needed
• On-site Generating CMU
• on site generating CMU
Active • 2028-29 (T-4), 2025-26 (T-1) ...
8.22 MW
Wight Salads, Arreton, Newport, Isle of Wight, PO30 3AR (5 components) Geocoding Needed

The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be the technology used

Active • 2024-25 (T-4), 2023-24 (T-4) ...
19.01 MW
Wight Salads Arreton Newport Isle of Wight PO30 3AR (2 components)

The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be the technology used (2)

Inactive • 2023-24 (T-1), 2022-23 (T-1)
5.48 MW
Westexe, Tiverton, Devon, EX16 5LL (6 components) Geocoding Needed

2026 kW CHP unit

Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.10 MW
WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (6 components) Geocoding Needed

Existing Generation on existing site - CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
39.32 MW
University of East Anglia, Norwich Research Park, Norwich, NR4 7TJ (7 components) Geocoding Needed

CHP

Active • 2024-25 (T-1), 2023-24 (T-1) ...
15.17 MW
Unit 3016 Hereford Street Bolton BL1 8HU (2 components)

E1000 CHP (2)

Inactive • 2023-24 (T-1), 2022-23 (T-1)
0.90 MW
0.89 MW
7.25 MW
Unit 2898 Tuscany Park Wakefield WF6 2TZ (2 components)

EnerG 1000 CHP (2)

Inactive • 2023-24 (T-1), 2022-23 (T-1)
0.91 MW
UK WINDOWS & DOORS GROUP LIMITED, 6400 Severn Drive, Tewkesbury, GL20 8SF. (2 components) Geocoding Needed

Cummins HSK78 2,000 kW Gas Engine located at UK WINDOWS & DOORS GROUP LIMITED, 6400 Severn Drive, Tewkesbury, GL20 8SF.

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENZ12 GL20
Inactive • 2023-24 (T-1), 2022-23 (T-1)
3.16 MW
Treviscoe Dryer, Little Treviscoe, St. Austell, PL26 7QN (9 components) Geocoding Needed
• Gas CHP in St. Austell
• Gas fired CHP unit
Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU KPEG55 PL26
Active • 2026-27 (T-4), 2025-26 (T-4) ...
13.60 MW
T&L Sugars Limited, Thames Refinery, Factory Road, Silvertown, London, United Kingdom, E16 2EW (19 components) Geocoding Needed
• No2 Steam turbine - Allen Steam Turbines/NG Model MB510 - 2009 - Nominal power rating 14500kWe
• No5 Gas Turbine - European Gas Turbines SGT200 'Tornado' - S765/01 1997 - Nominal power output 6000kWe
DSR Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU XGEN24 XGEN24 +6 more E16
Active • 2025-26 (T-4), 2023-24 (T-4) ...
63.21 MW
Thirsk Factory, Dalton Airfield, Topcliffe, Thirsk, YO7 3HE. (5 components) Geocoding Needed

1.280MW CHP

Active • 2026-27 (T-4), 2025-26 (T-4) ...
4.65 MW
Taw Valley Creamery, South Weeke, North Tawton, Devon, England, EX20 2DA (4 components) Geocoding Needed

CHP unit

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENZ02 GENZ02 +1 more EX20
Active • 2025-26 (T-4), 2024-25 (T-4) ...
5.34 MW
Stoneykirk Road, Stranraer, DG9 7BU (9 components) Geocoding Needed
• CHP unit
• Gas fired CHP unit
CHP and autogeneration Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU Base Power KPEG72 DG9
Active • 2024-25 (T-1), 2023-24 (T-1) ...
15.77 MW
Staverton, Trowbridge, Wiltshire, BA14 6PH (10 components) Geocoding Needed

Turbomach M50 Natural Gas fired CHP unit

CHP and autogeneration Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GCMU07 GCMU07 +4 more BA14
Active • 2024-25 (T-4), 2023-24 (T-1) ...
26.96 MW
Station Road, Wigton, Cumbria CA7 9BG (20 components) Geocoding Needed
• Back pressure steam turbine
• Gas engine
• Gas turbine
OCGT CHP and autogeneration Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GCMU16 GCMU16 +10 more CA7
Active • 2025-26 (T-4), 2024-25 (T-4) ...
66.96 MW
Stainland Boardmill, Holywell Green, Halifax, HX4 9PY (3 components) Geocoding Needed

Gas Fired CHP

Combined Heat and Power (CHP) E.ON UK PLC New Build Generating CMU SON_CHP SON_CHP HX4
Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.78 MW
Speke Blvd, Speke, Liverpool L24 9LE (3 components) Geocoding Needed
• On-site Generating CMU
• on site generating CMU
Active • 2025-26 (T-1), 2024-25 (T-1) ...
9.61 MW
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (10 components) Geocoding Needed

Existing Generation on existing site - CHP

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected WV15
Active • 2027-28 (T-4), 2026-27 (T-4) ...
22.71 MW
Solvay, Trinity St, Oldbury, B69 4LW (6 components) Geocoding Needed

Existing Generation on existing site - CHP

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected B69
Active • 2027-28 (T-4), 2026-27 (T-4) ...
6.66 MW
Slough Nurseries, Rochford Gardens, Uxbridge Road, Slough SL2 5NU (3 components) Geocoding Needed

One 2MW gas CHP engine in a horticultural environment

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX159 SL2
Active • 2027-28 (T-4), 2024-25 (T-1) ...
5.31 MW
Loading map...
Showing 25 locations