Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

121 unique locations (931 components) - Page 4 of 5

Haxby Rd, York, YO91 1XY (19 components)
• CHP Unit
• Gas fired CHP unit
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Glenfield Hospital, Groby Road, Leicester, LE3 9QP (7 components)
• CHP Unit
• Gas Fired CHP
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Glasshouse Energy Centre Wight Salads Nursery/Macketts Land Nursery Macketts Lane, Hale Common, Newport, Isle of Wight PO30 3AS (9 components)
• The CMU GLAS16 consists of two identical components, with each CHP engine delivering 5.5MW. The total CMU generation capacity is declared 11MW. The new development of two CHP engines which will be supplying heat, CO2 and power to the on-site Nursery.
• The CMU component GLAS01 consists of a CHP engine delivering 5.5MW. The CMU component will be supplying heat, CO2 and power to the on-site Nursery.
• The CMU component GLAS02 consists of a CHP engine delivering 5.5MW. The CMU component will be supplying heat, CO2 and power to the on-site Nursery.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Glasshouse Energy Centre Wight Salads Nursery/Macketts Land Nursery Macketts Lane, Hale Common, Newport, Isle of Wight PO30 3AS (6 components)
• The CMU GLAS16 consists of two identical components, with each CHP engine delivering 5.5MW. The total CMU generation capacity is declared 11MW. The new development of two CHP engines which will be supplying heat, CO2 and power to the on-site Nursery.
• The CMU component GLAS01 consists of a CHP engine delivering 5.5MW. The CMU component will be supplying heat, CO2 and power to the on-site Nursery.
• The CMU component GLAS02 consists of a CHP engine delivering 5.5MW. The CMU component will be supplying heat, CO2 and power to the on-site Nursery.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Gibbet Hill Road, Coventry, West Midlands, CV4 7AL (32 components)

One of six CHP units at University of Warwick, Gibbet Hill Road, Coventry, West Midlands, CV4 7AL

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Gaumont Tower Dalston Square Hackney London E8 3BQ (3 components)

A reciprocating gas engine CHP providing hot water to a local heating network

Inactive • 2021-22 (T-4), 2018-19 (T-1)
0.17 MW
Gaumont Tower Dalston Square Hackney London E8 3BQ (1 component)

A reciprocating gas engine CHP providing hot water to a local heating network

Inactive • 2018-19 (T-1)
Fulham Riverside Townmead Road Fulham SW6 2SY (5 components)

A reciprocating gas engine CHP providing hot water to a local heating network

Inactive • 2021-22 (T-4), 2018-19 (T-1)
0.17 MW
Fulham Riverside Townmead Road Fulham SW6 2SY (2 components)

A reciprocating gas engine CHP providing hot water to a local heating network

Inactive • 2018-19 (T-1)
Foundry Court, Southampton, SO19 9ST (3 components)

A reciprocating gas engine CHP providing hot water to a local heating network.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
0.17 MW
Foundry Court, Southampton, SO19 9ST (1 component)

A reciprocating gas engine CHP providing hot water to a local heating network.

Inactive • 2018-19 (T-1)
Former Oldchurch Hospital Waterloo Road Romford, Essex RM7 0BE (2 components)

A reciprocating gas engine CHP providing hot water to a local heating network

Inactive • 2021-22 (T-4), 2018-19 (T-1)
0.17 MW
Former Oldchurch Hospital Waterloo Road Romford, Essex RM7 0BE (1 component)

A reciprocating gas engine CHP providing hot water to a local heating network

Inactive • 2018-19 (T-1)
Fellside CHP Sellafield Ltd Seascale Cumbria CA20 1PG UK (5 components)

Fellside CHP is located in Seascale- Cumbria- UK and consists of three GE Frame 6581B gas turbines which are able to run on natural gas or distillate. The primary purpose …

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Energy Centre, Quarryfield Road, Gateshead NE8 3BE (24 components)
• 1 x 2MW CHP generator; natural gas reciprocating engine; primary fuel type = natural gas
• 1x2MW CHP generator: natural gas reciprocating engine. Primary fuel type = natural gas
• CHP in a district heating environment, providing heat & electricity to local area and exporting excess.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Edgabaston, Birmingham, West Midlands, B15 2TT (40 components)
• Gas Engine
• Gas Turbine Generator
• Gas engine
• ... and 1 more unique description
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
7.28 MW
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (69 components)
• Steam Driven Turbo Alternator 8G-2 6.8 MWe
• Steam Driven Turbo Alternator 8G1 6,8 MWe
• Steam Driven Turbo Alternator 8G2 6,8 MWe
• ... and 2 more unique descriptions
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
50.48 MW
Devons Road, Bromley by Bow, London, E3 3BF (14 components)

A reciprocating gas engine CHP site providing hot water to a local district heating network.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
1.00 MW
Deepdale Stadium, Sir Tom Finney Way, Preston PR1 6RU (4 components)

Gas CHP in a leisure & business environment providing heat and electricity to function suite and stadium and exporting excess

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Cowie Stirling FK7 7BQ (3 components)

14.700MW CHP located at Cowie, Stirling.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Cowie Stirling FK7 7BQ (1 component)

14.700MW CHP located at Cowie, Stirling.

Inactive • 2018-19 (T-1)
COFELY Great Coates, Grimsby, DN31 2TT (91 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
3.90 MW
Cleckheaton Road, Lowmoore, Bradford, BD12 0JZ (16 components)
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe BABR-1_2
• Steam Turbine
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
7.28 MW
Cleckheaton Road, Low Moor Bradford BD12 0JZ (9 components)
• Gas Turbine Generator 6.4MW CHP (tornado SGT 200 rated 6,4 MWe)
• Gas Turbine Generator 6.4MW CHP (tornado SGT 200 rated 6,4 MWe) BABR-1_1
Inactive • 2018-19 (T-1), 2017-18 (T-1) ...
7.28 MW
Cleckheaton Road, Lowmoor, Bradford, BD12 0JZ (13 components)
• Diesel Reciprocating Generator, rated 1MWe nominal
• Diesel Reciprocating Generator, rated 1MWe nominal BABR-2
• Gas turbine generator 6.4MWe CHP BABR-1
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
7.28 MW
Loading map...
Showing 25 locations