Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

8 unique locations (337 components)

Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (24 components)
• 2MW gas CHP engine in a horticultural environment
• One 1.354 MW gas CHP engine in a horticultural environment
• One 1.5 MW gas CHP engine in a horticultural environment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
9.85 MW
Station Road, Wigton, Cumbria CA7 9BG (57 components)
• Back pressure steam turbine
• Gas engine
• Gas turbine
Active • 2025-26 (T-4), 2024-25 (T-4) ...
57.56 MW
Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (18 components)
• Combined Cycle Gas Turbine
• One asset 1.13MW CHP engine in a horticultural environment with no auxiliary load.
• One asset 2.0MW CHP engine in a horticultural environment with no auxiliary load.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
4.87 MW
National Indoor Arena, King Edward Road, Birmingham, B1 2AA (15 components)
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 081171171
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
6.72 MW
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (16 components)
• 10 x 1mw gas generator units to be installed on designated land at Burghfield Road Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• Existing CCGT
• One CHP, generating for site load which exceeds generating capacity. No aux load.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Fiddler's Ferry Power Station, Widnes Road, Cuerdley, Warrington, WA5 2UT (103 components)
• GT3
• Genset 1.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
13899.76 MW
Excel Energy Centre Warehouse R Royal Victoria Dock Northside London E16 1BA (47 components)
• 1.2 MW Combined Heat and Power Engine.
• 1.6 MW Combined Heat and Power Engine
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
13.26 MW
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (57 components)
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 9MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
13.92 MW
Loading map...
Showing 8 locations