CHP and autogeneration

9 unique locations (313 components)

Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (24 components)
• 2MW gas CHP engine in a horticultural environment
• One 1.354 MW gas CHP engine in a horticultural environment
• One 1.5 MW gas CHP engine in a horticultural environment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
9.85 MW
SIMEC Lochaber Power Lochaber Smelter North Road Fort William PH336TH (65 components)
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 3 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 4 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
443.26 MW
Royal Liverpool University Hospital, Prescott Street, Liverpool L7 8XP (20 components)
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.241 MW and total net power capacity of 5.050 MW.
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.362 MW and total net power capacity of 5.290 MW.
• Industrial Gases production processes. DSR delivered through process interruption
Active • 2025-26 (T-1), 2024-25 (T-1) ...
16.06 MW
Pembroke Power Station Pembroke Dyfed SA71 5SS (55 components)
• Pembroke 21 - CCGT MSID: 7237
• Pembroke 41 - CCGT MSID: 7237
• Pembroke 51 - CCGT MSID: 7237
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6359.67 MW
Manchester Rd, Carrington, Manchester M31 4TG (32 components)
• 2 x 2.5 MW gas fuelled generators installed on land east of Griffiths Road.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 MW.
Active • 2026-27 (T-4), 2024-25 (T-1) ...
12.59 MW
High Street, Waterham, nr Faversham, Kent ME13 9EJ (17 components)
• 6 CHP engines horticultural environment with no auxiliiary load
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load curtailment
Active • 2027-28 (T-4), 2025-26 (T-4) ...
28.85 MW
Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS (23 components)
• Generating Unit 2
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
28.28 MW
Energy Center, Ashton Street, Liverpool, L69 3GB (68 components)
• Longannet coal fired power station - Unit 3
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Active • 2024-25 (T-4), 2023-24 (T-4) ...
18.40 MW
Asda Brierley Hill, Pedmore Road Brierley Hill West Midlands DY5 1LJ (9 components)
• Gas CHP engines in commercial horticultural usage with no auxilliary load
• Load reduction
• N/A
Active • 2025-26 (T-4), 2022-23 (T-3) ...
1.02 MW
Loading map...
Showing 9 locations