Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

9 unique locations (107 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Cardiff Road, Barry, Vale of Glamorgsan, CF63 2YL (22 components)
• Gas Turbine CHP GT001A
• Gas Turbine CHP GT001B
• Steam Turbine CHP
Active • 2026-27 (T-4), 2025-26 (T-4) ...
15.32 MW
Cats Terminal, Seal Sands Rd, Middlesbrough, Cleveland, TS2 1UB (3 components)

Turbo Expander - for pressure reduction of incoming natural gas

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Cleckheaton Road, Lowmoor, Bradford, BD12 0JZ (5 components)
• Diesel Reciprocating Generator, rated 1MWe nominal
• Diesel Reciprocating Generator, rated 1MWe nominal BABR-2
• Gas turbine generator 6.4MWe CHP BABR-1
CHP and autogeneration Combined Heat and Power (CHP) Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST02 GEN1(DSSMITH_BASF_UOB_TLOR2 8G4) +2 more BD12
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Cleckheaton Road, Low Moor Bradford BD12 0JZ (3 components)
• Gas Turbine Generator 6.4MW CHP (tornado SGT 200 rated 6,4 MWe)
• Gas Turbine Generator 6.4MW CHP (tornado SGT 200 rated 6,4 MWe) BABR-1_1
CHP and autogeneration Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST02 GEN1(DSSMITH_BASF_UOB_TLOR2 8G4) +1 more BD12
Inactive • 2018-19 (T-1), 2017-18 (T-1) ...
Cleckheaton Road, Lowmoore, Bradford, BD12 0JZ (5 components)
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe BABR-1_2
• Steam Turbine
CHP and autogeneration Combined Heat and Power (CHP) Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST03 GEN1(DSSMITH_BASF_UOB_TLOR2 8G4) +2 more BD12
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Denison road, Selby, North Yorkshire, YO8 8AN. (19 components)
• Gas Turbine Cogeneration Unit
• Gas Turbine Cogeneration Unit GT3
• One 8 MWe Gas Turbine Cogeneration Unit (GT2)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
21.52 MW
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (31 components)
• Steam Driven Turbo Alternator 8G-2 6.8 MWe
• Steam Driven Turbo Alternator 8G1 6,8 MWe
• Steam Driven Turbo Alternator 8G2 6,8 MWe
CHP and autogeneration Combined Heat and Power (CHP) Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST07 EA 17/18 REST08 +14 more DN40
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Edgabaston, Birmingham, West Midlands, B15 2TT (16 components)
• Gas Engine
• Gas Turbine Generator
• Gas engine
CHP and autogeneration Combined Heat and Power (CHP) Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST01 GEN1(DSSMITH_BASF_UOB_TLOR2 8G4) +2 more B15
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Kemsley Mill, SittingBourne, Kent, ME10 2TD (3 components)
• One 40MWe gas Turbine Generation unit
• One 40MWe gas Turbine Generation unit which is part of the Kemsley 1 CHP Plant
CHP and autogeneration Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST05 GEN1(DSSMITH_BASF_UOB_TLOR2 8G4) +1 more ME10
Inactive • 2018-19 (T-1), 2017-18 (T-1) ...
Loading map...
Showing 9 locations