Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

99 unique locations (1417 components) - Page 1 of 4

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Woodhouse Energy Centre, A. Pearson and Sons? Nursery, Alderley Edge , SK9 7UW (12 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• ... and 1 more unique description
Active • 2029-30 (T-4), 2028-29 (T-4) ...
12.35 MW
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (21 components)
• 2MW gas CHP engine in a horticultural environment
• One 1.5 MW gas CHP engine in a horticultural environment
• One 2MW gas CHP engine in a horticultural environment
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX110 FLEX110 +5 more WA16
Active • 2029-30 (T-4), 2028-29 (T-4) ...
15.96 MW
Wissington Sugar Factory British Sugar plc College Road Wissington King's Lynn PE33 9QG (16 components)

The CMU is a gas fired CCGT CHP

CHP and autogeneration Combined Heat and Power (CHP) BRITISH SUGAR PLC Existing Generating CMU Wissington CHP Wissington CHP +1 more PE33
Active • 2029-30 (T-4), 2028-29 (T-4) ...
171.57 MW
Winnington CHP, Winnington Lane, Winnington, Northwich, Cheshire, CW8 4GX (28 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (2)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
119.61 MW
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (13 components)

One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load. (3)

CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX110 FLEX110 +2 more WR11
Active • 2029-30 (T-4), 2028-29 (T-4) ...
3.65 MW
WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (6 components)

Existing Generation on existing site - CHP (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
36.30 MW
WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (7 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CE_Aggregated 3 CE_Aggregated 3 +1 more HA9
Active • 2029-30 (T-4), 2028-29 (T-4) ...
2.67 MW
Weetabix, Station Rd, Burton Latimer, Kettering NN15 5JR, United Kingdom (13 components)

On-site CHP - existing generating unit (3)

Active • 2029-30 (T-4), 2028-29 (T-4) ...
40.02 MW
Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP (12 components)

Warrington Existing Site CHP (3)

Active • 2029-30 (T-4), 2028-29 (T-4) ...
5.17 MW
The Ridgeway , Enfield, Middlesex, EN2 8JL (12 components)
• On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980
• On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980
Active • 2029-30 (T-4), 2027-28 (T-4) ...
3.88 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (22 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP) SPARK STEAM LIMITED Existing Generating CMU Spark Steam Energy Centre Spark Steam Energy Centre +1 more TS23
Active • 2029-30 (T-4), 2028-29 (T-4) ...
24.57 MW
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (14 components)
• Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter for St. Marks (NOR001) has provided their three peaks, we have used the combined peak (4.423MW) of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
• Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the combined peak of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.45 MW
St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (10 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CE_Aggregated CE_Aggregated +4 more E3
Active • 2029-30 (T-4), 2028-29 (T-4) ...
0.53 MW
Staithes Road, Preston, Hull, HU12 8TB (18 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2029-30 (T-4), 2028-29 (T-4) ...
5.49 MW
Stainland Boardmill, Holywell Green, Halifax, HX4 9PY (3 components)

Gas Fired CHP (3)

Combined Heat and Power (CHP) E.ON UK PLC New Build Generating CMU SON_CHP SON_CHP HX4
Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.78 MW
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (11 components)

Existing Generation on existing site - CHP (3)

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected WV15
Active • 2029-30 (T-4), 2027-28 (T-4) ...
24.61 MW
Southampton General Hospital, Tremona Road, Southampton SO16 6YD (14 components)

The Hospital has an Energy Center with electricity generating units and surplus power is exported to the grid.

Active • 2029-30 (T-4), 2028-29 (T-4) ...
20.78 MW
Solvay, Trinity St, Oldbury, B69 4LW (6 components)

Existing Generation on existing site - CHP (3)

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected B69
Active • 2027-28 (T-4), 2026-27 (T-4) ...
6.46 MW
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham, B7 5RE (13 components)
• 1 x 3.5MW natural gas fired turbine + 1 x 4.8MW natural gas fired turbine
• 8.300MW Gas Turbine installation
• 8.3MW Gas Turbine installation
Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.58 MW
Slough Nurseries, Rochford Gardens, Uxbridge Road, Slough SL2 5NU (3 components)

One 2MW gas CHP engine in a horticultural environment

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX159 SL2
Active • 2027-28 (T-4), 2024-25 (T-1) ...
5.31 MW
Shottentons Farm, Pecks Hill, Nazeing, Essex, EN9 2NY (8 components)

Gas fuelled CHP generation plant

Active • 2027-28 (T-4), 2025-26 (T-4) ...
16.48 MW
"Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS, United Kingdom" (14 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S19GT2 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S20G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• ... and 7 more unique descriptions
Active • 2029-30 (T-4), 2028-29 (T-4) ...
153.09 MW
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (22 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S20G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
246.10 MW
School Road, Aberdeen AB24 1TU (14 components)
• District heating implementation with 2 x 1.063MW CHP exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations. Historic Average Output is 1,916.424kW.
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.96 MW
Samworth Brothers, 81-83 Tavistock Road, Callington, Cornwall, PL17 7TA (12 components)

Callington - Existing Site CHP unit

Active • 2029-30 (T-4), 2028-29 (T-4) ...
16.67 MW
Loading map...
Showing 25 locations