Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

23 unique locations (253 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (6 components)

Existing Generation on existing site - CHP (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
36.30 MW
Weetabix, Station Rd, Burton Latimer, Kettering NN15 5JR, United Kingdom (13 components)

On-site CHP - existing generating unit (3)

Active • 2029-30 (T-4), 2028-29 (T-4) ...
40.02 MW
Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP (12 components)

Warrington Existing Site CHP (3)

Active • 2029-30 (T-4), 2028-29 (T-4) ...
5.17 MW
The Ridgeway , Enfield, Middlesex, EN2 8JL (12 components)
Active • 2029-30 (T-4), 2027-28 (T-4) ...
3.88 MW
Staithes Road, Preston, Hull, HU12 8TB (18 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2029-30 (T-4), 2028-29 (T-4) ...
5.49 MW
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (11 components)

Existing Generation on existing site - CHP (3)

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected WV15
Active • 2029-30 (T-4), 2027-28 (T-4) ...
24.61 MW
Solvay, Trinity St, Oldbury, B69 4LW (6 components)

Existing Generation on existing site - CHP (3)

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected B69
Active • 2027-28 (T-4), 2026-27 (T-4) ...
6.46 MW
Samworth Brothers, 81-83 Tavistock Road, Callington, Cornwall, PL17 7TA (12 components)

Callington - Existing Site CHP unit

Active • 2029-30 (T-4), 2028-29 (T-4) ...
16.67 MW
Saddlebow Industrial Estate, Poplar Avenue, King's Lynn PE34 3AL (17 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Power Station for Paper plant made up of 1x35MW Gas engine
• Power Station for Paper plant made up of 1x35MW Gas engine plus 1x12MW steam turbine
Active • 2029-30 (T-4), 2028-29 (T-4) ...
41.29 MW
Queensway Campus Hortonwood, Queensway, Hadley, Telford TF1 7FS (2 components)

On site generating CMU

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected TF1
Active • 2027-28 (T-4), 2024-25 (T-1)
3.59 MW
Poole Sustainable Energy LTD, Sterte Ave, Poole, Dorset, BH15 2AS (12 components)

Poole Existing Site CHP

Active • 2029-30 (T-4), 2028-29 (T-4) ...
8.34 MW
Pond Street, London, NW3 2QG (12 components)

On-site CHP - existing generating unit Pond Street London OS Grid Reference: TQ 272 854 NW3 2QG

Active • 2029-30 (T-4), 2027-28 (T-4) ...
15.41 MW
Pembroke Rd, Merlin's Bridge, Haverfordwest SA61 1JN (8 components)

Existing Generation on existing site - CHP

Active • 2029-30 (T-4), 2028-29 (T-4) ...
7.71 MW
MGH Property Services Limited, Laurels Farm, Hatherton, Nantwich, CW5 7PW (12 components)

Nantwich Existing Site CHP

Active • 2029-30 (T-4), 2028-29 (T-4) ...
6.05 MW
Maesgwyn Farm, Chirk, Wrexham, LL14 5NT (16 components)

On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU GridBeyond GBD009 LL14
Active • 2029-30 (T-4), 2028-29 (T-4) ...
168.87 MW
Hams Hall Sustainable Energy LTD, Edison Road, Hams Hall Distribution Park, Coleshill, B46 1AL (12 components)

Hamms Hall - Existing Site CHP

Active • 2029-30 (T-4), 2028-29 (T-4) ...
7.30 MW
Clay Wheels Ln, Wadsley Bridge S6 1LY (3 components)
• On-Site Generating CMU
• new build on site generating CMU
Active • 2027-28 (T-4), 2026-27 (T-1) ...
3.69 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA (24 components)
• existing CHP on site.
• existing on site CHP
• existing onsite CHP
Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected DN16
Active • 2027-28 (T-4), 2026-27 (T-4) ...
149.20 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (21 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• existing CHP on site
DSR Combined Heat and Power (CHP) GRIDBEYOND LIMITED Proven DSR CMU Endeco Technologies CMU1 DN16
Active • 2028-29 (T-4), 2027-28 (T-4) ...
42.08 MW
Bar Ln, Boroughbridge, Roecliffe, York YO51 9NN (6 components)

on site generating CMU

Active • 2029-30 (T-4), 2027-28 (T-4) ...
8.97 MW
Aspatria Creamery/Station Rd, Wigton CA7 2AR (8 components)

Existing Generation on existing site - CHP

Active • 2029-30 (T-4), 2028-29 (T-4) ...
7.71 MW
5 Coulman St, Thorne, Doncaster DN8 5JT (3 components)
• On-Site Generating CMU
• new build on site generating CMU
Combined Heat and Power (CHP) GRIDBEYOND LIMITED New Build Generating CMU On-Site Energy - Chesterfield Poultry DN8
Active • 2027-28, 2026-27 ...
2.75 MW
2 Samworth Way, Melton Mowbray LE13 1GA (7 components)

Existing Generation on existing site - CHP

Active • 2029-30, 2028-29 ...
9.34 MW
Loading map...
Showing 23 locations