CHP and autogeneration

34 unique locations (880 components) - Page 1 of 2

Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (13 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.23 MW
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (25 components)
• 2MW gas CHP engine in a horticultural environment
• One 1.354 MW gas CHP engine in a horticultural environment
• One 1.5 MW gas CHP engine in a horticultural environment
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.01 MW
167.38 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (43 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (3)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
119.61 MW
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (17 components)
• Gas CHP in a horticultiral environment providing heat for crop growth
• One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.74 MW
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (14 components)
• Gas CHP engines 1.5MW and 1.48MW. Primary fuel type = Natural Gas
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Active • 2028-29 (T-4), 2026-27 (T-4) ...
5.59 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (32 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.39 MW
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham B7 5RE (17 components)
• 8.300MW Gas Turbine installation
• 8.3MW Gas Turbine installation
Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.58 MW
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (14 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S19GT2 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S20G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.40 MW
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (25 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S20G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
184.43 MW
School Road, Aberdeen AB24 1TU (23 components)
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.22 MW
Saltend Power Station Saltend Hull HU12 8GA (39 components)
• Unit 1 at Saltend Power Station
• Unit 1 at Saltend Power Station.
• Unit 2 at Saltend Power Station
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3107.85 MW
RRRL-EfW Facility Norman Road North Belvedere Kent DA17 6JY (20 components)

Energy from Waste Recovery Facility

Active • 2028-29 (T-4), 2027-28 (T-4) ...
275.36 MW
Royal Liverpool University Hospital, Prescott Street, Liverpool L7 8XP (17 components)
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.241 MW and total net power capacity of 5.050 MW.
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.300 MW and a net power capacity of 5.109 MW after taking into account generator auxiliary load.
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.334 MW.
• ... and 2 more unique descriptions
Active • 2026-27 (T-4), 2025-26 (T-4) ...
14.33 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
• New build gas reciprocating multi-engine generating plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3439.50 MW
QMC Campus, Nottingham University Hospitals, Queens Medical Centre, Derby Road, Nottingham, NG7 2UH (13 components)
• A site with one gas turbine CHP, providing steam and electricity to Queens Medical Centre in Nottingham
• A site with one gas turbine CHP, providing steam and electricity to Queens Medical Centre in Nottingham.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
27.92 MW
Power Station Road Isle of Grain Rochester ME3 0AR (70 components)
• Grain B CCGT Unit 6 CHP element is via supply of heat to Grain LNG regasification facility
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• Grain B CCGT Unit 7 CHP element is via supply of heat to Grain LNG regasification facility
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
15432.47 MW
Nr 125 Park Lane Cottingham East Yorkshire HU16 5RX (21 components)
• CHP at a horticultural environment.
• CHP at horticultural site
• Gas CHP engines in commercial horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.29 MW
Newton Aycliffe CO Durham DL5 6EA (50 components)
• This is an existing CHP (4)
• This is a long standing existing CHP unit located on land within a manufacturing site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
47.40 MW
Montgomery Road, Aberdeen AB24 2YA (22 components)
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.46 MW
Lansdale Nursery, Jacksmere Lane, Scarisbrick, Ormskirk, Lancs L40 9RT (22 components)
• Gas CHP engine in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• One asset 2.0MW CHP engine in a horticultural environment with no auxiliary load.
• One asset 2.0MW CHP engine in a horticultural environment with no auxilliary load. Primary fuel type = Natural Gas
Active • 2027-28 (T-4), 2026-27 (T-4) ...
5.29 MW
John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU (11 components)
• New 4.5MW CHP at Oxford Hospital
• VIT305 - CHP unit at John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
12.21 MW
Europa Energy Centre, Hills Court Road, Ash, Kent, CT3 2AP (26 components)
• The CMU BREH14 consists of two CHP components supplying heat, CO2 and power to the on site Nursery.
• The CMU BREH14 consists of two CHP components supplying heat, CO2 and power to the on-site Nursery.
• The CMU Component will have a connection capacity of 15MW. Gas-fired reciprocating engine will be the technology used.
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
55.68 MW
Drakemyre, Dalry KA24 5JJ (33 components)
• Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• One 22.9MVA gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2026-27 (T-4) ...
55.08 MW
Denison Road, Selby, North Yorkshire YO8 8AN (24 components)
• Gas Turbine Cogeneration Unit
• One 8 MWe Gas Turbine Cogeneration Unit (GT2)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
7.51 MW
Loading map...
Showing 25 locations