Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

9 unique locations (366 components)

Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (43 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (3)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
119.61 MW
Newton Aycliffe CO Durham DL5 6EA (50 components)
• This is an existing CHP (4)
• This is a long standing existing CHP unit located on land within a manufacturing site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
47.40 MW
498.20 MW
9 Handyside St, Kings Cross, London N1C 4BH (15 components)

Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations. (3)

Active • 2027-28 (T-4), 2025-26 (T-4) ...
29.15 MW
47-53 Charterhouse Street, London, EC1M 6PB (27 components)

A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
124.28 MW
46 Station Road Stokesley Middlesbrough TS9 7AA (14 components)
• Gas CHP engines in commercial horticultural usage with no auxilliary load (2)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
Active • 2027-28 (T-4), 2025-26 (T-4) ...
57.19 MW
323 Avebury Boulevard, MILTON KEYNES MK9 2GA (12 components)

District heating implementation of two gas CHP engines with no auxilliary load (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
32.36 MW
1 Thane Road West, Nottingham, NG2 3AA (128 components)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA (2)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
477.82 MW
100 Montifichet Road, Westfield, Stratford E20 1GR (60 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
253.39 MW
Loading map...
Showing 9 locations